mhm-new-logo.gif
prod spot.png

Aluminator Retrofit Roof Drain with MaxxFlo Seal is designed to quickly address the need to replace existing roof drains in a re-roofing application. Durability is assured through the use of heavy duty (0.81”) aluminum. The exclusive MaxxFlo mechanical seal offers superior protection against water backup. Available with a variety of flange options (plain aluminum, TPO clad, PVC clad and asphalt coated) to accommodate most roofing systems.

  • Installation tool included with each drain
  • Meets and exceeds ANSI/SPRI RD1 requirements for water back flow
  • Exclusive MaxxFlo mechanical seal prevents water backup
  • Maximized drainage: 1 1/4” heavy duty aluminum drain ring has 12 scallops and seep holes on bottom
  • Available in 3", 4", 5", and 6"
Learn More
More Deck.jpg
Drain1.jpg
tech talk.png

Unsure what to do about broken or missing drain bolts? As annoying as this can be on a re-cover project, there is a simple solution. A retrofit drain. But how do you size them to the pipe and order the correct one the first time?This is relatively simple. The Mule-Hide Aluminator Retrofit Roof Drain with MaxxFlo seal has a sizing chart on the product data sheet. This will ensure you are selecting the correct size the first time, every time.

icymi background no logo.png


Coating systems can breathe new life into mature low-slope roofing systems, brightening their appearance, enhancing their energy efficiency and delaying for years the day when they have to be re-covered or replaced. They also can help contractors navigate the current supply chain challenges and keep projects on schedule by giving them an additional solution to offer their customers.


For a coatings system to perform, however, the roof substrate must first be properly prepared. Fail to do so, and a roof restoration that could have lasted 10 or 20 years can fail in as little as two or three.

IMG_1954-min.JPG

In an article for the November/December 2021 issue of Roofing magazine, Jeremy Grunewald, National Products Manager at Mule-Hide, outlined the three steps contractors should complete before picking up a brush, roller or sprayer to apply a roof coating system. 

Read the Article
mule of fortune.png

Correctly solve the puzzle below and be entered into a drawing for a chance to win Mule-Hide swag!

mule of fortune.png
Submit Answer
NEW_Mule-Hide 3D Logo.png

Stay Connected!

Facebook  Instagram  LinkedIn  Web  YouTube