AZGS AZ Mining Review Tours  
Florence Copper

Pilot well field with Poston Butte in the background.  
Courtesy of Florence Copper, Inc.  
 
On 24 July 2018, the Arizona Mining Review team joined Dan Johnson, Vice President & General Manager of Florence Copper, and Stacy Gramazio, Manager of Communications & Public Affairs, for an early morning tour of the pilot in-situ copper recovery (ISCR) facility outside Florence, Arizona.
 
Florence Copper is in the final stage of deploying a $25 million production test facility, designed to harvest 1.5 million pounds of copper annually for several years. Following successful proof of concept, Florence Copper has plans for a larger plant to recover 55 million pounds of copper annually for the first 6 years, and 85 million pounds annually for another 14 years. Over a 20-year lifespan, Florence Copper estimates the recovery project will yield ~$3.4 billion dollars in revenue.
 
In-situ copper recovery is a 3-phase process: Phase 1 - injection of the active fluid (99.5% water with 0.5% sulfuric acid) with a pH similar to household vinegar; Phase 2 - extraction of the pregnant, copper-rich solution; and, Phase 3 - using electrowinning, a process first pioneered in the Globe-Miami area in the late 1960s, to produce ~ 100-pound copper cathodes that are 99.999% copper.
 
The Arizona Mining Review is funded in part by the Mining Foundation of the Southwest.