|
When's your next oil change?
|
We all know we have to have the oil changed in our car every 3000-5000 miles, but do you know how often you need to have your electrical equipment tested? Do you know what equipment should be tested or when it was last tested?
Scheduling regular electrical system maintenance is just as important as getting your car's oil change! A small investment in preventive maintenance can save you a lot of money, and headaches, in the future should something go wrong.
The Institute of Electrical and Electronics Engineers (IEEE) reports that the failure rate of electrical components is three times higher for systems without preventive maintenance programs.
Contact us to schedule your infrared and de-energized testing for 2015!
|
| |
|
Why Conduct Preventive Maintenance on Your Gear?
|
Statistics from IEEE show that you can effectively reduce your risk of an unscheduled outage by as much as 66 percent with an effective electrical preventive maintenance program.
PowerHawke offers a variety of solutions to keep your electrical infrastructure safe and functioning when you need it. Energized, de-energized, and electrical safety solutions are available.
|
| |
|
Infrared Thermography is highly effective in uncovering issues with no disruption to daily business.
|
|
|
The best way to ensure your system stays working is by shutting it down and testing your components.
|
|
|
An Arc Flash Risk Assessment can analyze your electrical system and pinpoint risk areas.
|
|
|
| |
|
PowerHawke, Inc.
132 Scott Swamp Road
Farmington, CT 06032
Phone: 860-606-0065
|
PowerHawke by Harlan
441 Allied Drive
Nashville, TN 37211
Phone: 615-781-1170
|
| |