The Heart of RUSH: Our People

Meet Karen Stevens, Contract Administrator and HR Coordinator at RUSH Construction since 1997. A Florida native, Stevens pursued a position at RUSH after hearing about the firm's reputation as an excellent company. While RUSH soundly met her expectations, she was not prepared for the eclectic assortment of individuals with whom she was about to share the next 17 years. 

Karen and her husband, Thomas

 

For Karen, the most memorable moment working with RUSH was the first company cruise that she attended; that was the first time she glimpsed each of her co-workers in a casual, fun setting, as the diverse individuals that they are.

 

As with the majority of RUSH employees, Stevens loves her job, and wouldn't trade places with anyone else in the company. Her position allows her to interact with each of RUSH's team members and projects, and keeps her wondering what will come next. "Being a part of such a complex and diverse company keeps me wondering what opportunity will present itself next," says Karen. "That is why I have stayed with RUSH for so long."

 

Karen names the Defense Equal Opportunity Management Institute (DEOMI) at Patrick Air Force Base as her favorite RUSH project to date. She had not previously worked on a project of such magnitude, and really enjoyed helping the company develop a relationship with such an interesting new client.

 

As one of RUSH's original 7 stockholders since the year 2000, Stevens takes a lot of pride in being a part of RUSH, and continues to be inspired by RUSH's endearing effort to uphold the highest standards of quality and integrity. 

Follow RUSH
on Social Media!

Like us on Facebook  Follow us on Twitter
Connect with us on
Featured RUSH Project:
Defense Equal Opportunity Management Institute (DEOMI)
Project Location: Patrick Air Force Base
Facility Size: 92,000 SF
Duration: 24 Months

DEOMI is a 90,000 SF, two-story, design-build, education and training facility that will accommodate more than 400 students. The structure consisted of precast concrete wall panels and a structural steel frame. The building utilizes a "Florida Mediterranean" style of architecture and includes classrooms, faculty offices, a library, computer rooms, break areas, research rooms, and an auditorium. This state-of-the-art facility is equipped with the latest in audio, video, and communication systems and technology. The extensive site work included installation of a new lift station.

"To give real service you must add something which cannot be bought or measured with money, and that is sincerity and integrity."

- Douglas Adams


SOCIALIZE WITH RUSH




www.rushinc.com | 321.267.8100