Tahoe Transportation District has been the local lead agency for the project for over six years and will be through the completion of the project. Central Federal Lands Highway Division (CFLHD) is the lead agency for construction and design of the project. On October 3, 2016 Martin Brothers Construction was awarded the construction contract.
Project goals include:

  • Improve pedestrian and cyclists’ safety
  • Alleviate traffic congestion to improve transit travel times and user experiences
  • Provide two safety routes from the west shore
  • Make the “wye” area more inviting for shopping and dining
  • Add street enhancements to the portion of “old SR 89/West Lake Blvd. that will become a local road
  • Encourage economic development and revitalize the community
  • Rebuild 89 year-old Fanny Bridge with sidewalks on both sides
  • Improve reliability and connectivity with the new transit center
  • Lessen emissions by a reduction in vehicles idling in traffic and sediment run-off from graded storm water treatment