The Design/Build Story of  Playalinda Brewing Company - Brix Project in Titusville
The Brix Project
With the goal of transforming a 1960's era lumber yard/building into a 16,250 s.f. microbrewery and full-service restaurant, Design-Builder RUSH Construction, Inc. took steps during both design and construction to salvage and reuse as much of the materials from the existing building as possible. At Playalinda Brewing Company - Brix Project, the existing repurposed spaces, along with the added areas, provide a tasting room, restaurant, and fully operational microbrewery.
RUSH Welcomes New Project Manager, Ben Thornton

A project manager at RUSH since March 2018,  Reuben Thomas Thornton V (Ben),  says that he chose RUSH because of the company's reputation and high moral character: "So far my impression is that the company and employees really embrace the 'Building with Integrity' lifestyle."

Originally from California, Ben moved to Satellite Beach, Florida, in the year 2000. After graduating from Satellite High School, he attended college at Florida State University obtaining a degree in Civil Engineering. 

RUSH Staff Show Up to Support US Navy League in 5K Race
RUSH Construction staff members were proud to participate in the 2nd Annual Navy League 5K at Port Canaveral last Saturday! The proceeds from the race will benefit US Navy League Cape Canaveral Council. Pictured above from left to right: Mike Schermer, Administrative Assistant Laurie Solis, Senior Estimator Tim Saunders, Vicki Crosswell, and Project Manager Karyn Barker.
Check out the projects that RUSH currently has under construction!


RUSH Construction  | 321-267-8100 | www.rushinc.com

SOCIALIZE WITH RUSH
FB
TWT
LI