News & Updates #4
January 2018
Mass+Main is an assemblage of three buildings on two city blocks at the corner of Massachusetts Avenue and Main Street in Central Square, Cambridge. In the spring of 2017 [  t  ]  Twining Properties received approvals for a 308 unit mixed-income residential community.
M+M FOUNDATIONS
COLUMBIA ST FOUNDATIONS & BASEMENT

Steel piles were completed in the 1st week in January. Concrete foundations and the basement structure should be completed in Spring 2018.

GARAGE SLURRY WALLS ALONG MASS AVE

The guide walls for slurry-walls are in place and the process of forming the two-story garage box under the Mass Ave tower has started. The slurry walls will be completed in March. Excavation and completion of the garage structure is scheduled for this Summer.
47 BISHOP ALLEN DRIVE

Foundations and backfilling were completed in early December. Below-slab plumbing and utilities were installed before the frigid weather hit later in the month. The slab-on-grade is scheduled for the end of January. The panelized 4-story wood structure will be erected by mid-March. The building should be fully enclosed by late spring.