Beaver Creek Community Calendar

August 1, 2017

 

 Paving
Scheduled on I-17
 
Watch for Paving on Interstate 17 near McGuireville and Stoneman Lake
Motorists traveling northbound on Interstate 17 near McGuireville and Stoneman Lake exits should allow extra time while paving is underway this week. Paving begins from 5 a.m. to 5 p.m. Tuesday, August 1 near McGuireville between mileposts 291 to 294. Construction continues from 5 a.m. to 5 p.m. Wednesday, August 2, and Thursday, August 3 on three miles of roadway near the Stoneman Lake exit between mileposts 307 to 311. A single-lane restriction will be in place to accommodate work at both locations.
Drivers should use caution and watch for construction personnel and equipment while paving is underway.
Schedules are subject to change based on weather and other unforeseen factors. For more information, call the ADOT Project Information Line at 855.712.8530 or email Projects@azdot.gov. For real-time highway conditions statewide, visit ADOT's Traveler Information Site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.
 
 

Join Our Mailing List