Construction Activities

Katella Avenue Update

Over the next few months, crews will continue working behind k-rail on eastbound and westbound Katella Avenue between the freeway and Epson Way. Work includes relocating utilities, reconstructing the sidewalks and performing roadway work to make room for a new bike lane. 


Both directions of Katella Avenue have been reduced to three lanes between the northbound I-605 ramps and Epson Way. Motorists may experience traffic delays and should allow extra time to reach their destinations. Please use caution while traveling through the construction area.


Work hours are 6.a.m. to 4 p.m. Monday through Friday. Weekend and night work may be required for some activities. As with any construction project, the public may experience noise, vibration and lighting for nighttime construction operations.


Sidewalk Access

While the sidewalks on eastbound and westbound Katella are under construction, pedestrians can use a protected walkway on eastbound Katella, which serves as a temporary pedestrian detour route.

This work may be loud. The schedule is subject to change due to inclement weather or unforeseen operational issues.

Rainy Weather Safety Reminder

With wet weather in the forecast, please use extra caution around construction zones. Rain can create slippery surfaces, reduce visibility, and make roadways unpredictable.


Here's how you can keep everyone safe:

  • Slow down and allow extra space between vehicles.
  • Avoid driving through flooded areas or around closed lanes.
  • Watch for construction crews and equipment, which may be adjusting operations due to weather.
  • Stay alert for changing traffic patterns or signage near work zones.


Our crews carefully monitor conditions and may temporarily pause work to maintain safety for both workers and the traveling public.


Construction activities were canceled today, Friday, Nov. 14 due to inclement weather. Please view the project Google Map below for the most up-to-date closure schedules. 

Upcoming Closures

Please plan ahead and expect delays during these times. The following closures are expected to be in place nightly beginning as soon as 9 p.m. to 7 a.m., Monday, Nov. 17 through Friday, Nov. 21 (into Saturday morning):


  • Outside lanes on eastbound and westbound Katella Avenue/Willow Street,

at least one lane will be open to traffic at all times


  • Outside lane on northbound and southbound I-605 at Katella Avenue/Willow Street; at least one lane will be open to traffic at all times






Closures and Detours Map

An interactive "Closures and Detours Map" is updated regularly highlighting major activities and associated closures and detours. We encourage users to bookmark the link for quick access to real-time construction information. Click on the image to be redirected.

About the Project

The Orange County Transportation Authority (OCTA), in cooperation with Caltrans, is improving the local interchange at Interstate 605 (I-605) and Katella Avenue. The project will enhance safety and traffic flow by modifying existing on- and off-ramps, making improvements on Katella Avenue, and improving bicycle and pedestrian facilities.

STAYCONNECTED

Facebook  Instagram

octa.net/605Katella | 888-200-3302 | 605KatellaInfo@octa.net | @605Katella

Text "605Katella" to 888-720-7016 to receive text alerts.