Work continues on the center section of the bridge over the Jordan River along with street light installation on the south side of 9000 South.
Sidewalk and driveway work continues on the south side of 9000 South. During sidewalk and driveway work, properties with more than one access will have one access closed while the other access is left open. Properties with only one access will be coordinated with the project team.
Pedestrians should continue to use the north side of 9000 South between 1000 West and Redwood Road and use the approved detour to cross the Jordan River.
|