Work continues on barrier walls near 900 West along with sidewalk and driveway work on the south side of 9000 South. During sidewalk and driveway work, properties with more than one access will have one access closed while the other access is left open. Properties with only one access will be coordinated with the project team.
Pedestrians should continue to use the north side of 9000 South between 1000 West and Redwood Road and use the approved detour to cross the Jordan River (below).
Work continues on the bridge and drainage structures near the Jordan River.
Park strip irrigation is starting on the south side of 9000 South near Redwood Road working east.
The project is on schedule to be completed in July 2025.
Schedules are subject to change due to weather and material/equipment availability.
|