Pictured above clockwise: Kindergarten boys enjoying outdoor learning on the steps to 126 East 78th Street; eighth-grade boys practicing their basketball skills in the new Middle School regulation-size gymnasium; Mr. Chaplin Warren testing out aquaponic equipment in the teaching greenhouse.
What's Next?
Summer 2021
Over the summer, we will be putting the finishing touches on this historic renovation and expansion which include:

  • A renovated and welcoming lobby and reception area with seating for guests, art display areas, as well as enhanced security features (pictured below)

  • An updated health office

  • A re-envisioned library

  • Refurbished 2nd and 3rd floor classrooms and hallways, Head of School office and new admissions seating area

  • The installation of a second elevator

  • Replacement of the sidewalk in front of the main schoolhouse and townhouses

In addition, we are awaiting FDNY approval of a generator to power the covered outdoor rooftop playspace (pictured below). We are optimistic that we will be granted the necessary permissions for this special (and fun!) outdoor space for our boys.

If you have specific questions about the project or wish to learn more about the campaign to support it, please email kduckworth@allen-stevenson.org.