WHAT: Construction activities have continued behind temporary walls in the main part of the high school building through the first quarter.
- Phase 1B, 2A, 2B, 2C, 2D, 2E - These phases are effectively complete. Sixty-seven classrooms, a renovated BHS main office and Clinic are now in use at BHS. Most of the Team Office space is now open. Some small parts of the new Team Offices will remain closed until Spring Break 2019. The PE/Health space, and performing arts classroom space are in use seven periods a day with study hall classes utilizing the space during open class periods this year.
- Phase 3A - (see timeline below) This phase will continue through the end of 2019. Since Spring Break 2018, the BHS auditorium has been closed. It will reopen in January 2020. The renovations to the auditorium as well as the new entrance from Grant Street are pictured in the photo at the top of the newsletter. The second photo above includes new science labs and a new, wide main hallway on the west side of the building, connecting new classrooms with the new cafeteria, auditorium and senior academy.
WHY: The core of the Brownsburg High School building has been relatively unchanged since it opened in 1971. With 13 additions over the last 46 years, the infrastructure of the building is in dire need of an upgrade. These upgrades will accommodate technology needs for teachers and students that weren't in place in 1971 and maintain a comfortable learning environment with updates to the aging HVAC system.
COMPLETION DATE FOR CURRENT PHASES OF WORK:
Phase 1A – Effectively complete
Phase 1B - Effectively complete
Phase 2A – Effectively complete
Phase 2B – Effectively complete
Phase 2C - Effectively complete
Phase 2D - Effectively complete
Phase 2E – Effectively complete
Phase 3A - January 2020