Irene Road Closure
The existing Irene Road (between Newburg & U-S 20) is a two-lane rural section roadway featuring two 90 degree turns. The relocation of Irene Road will eliminate the sharp turns and the reconstruction will provide a three-lane urban roadway section that will be critical for the flow of truck traffic to the shipping and receiving points at the new facility, as well as provide for a safer environment for the motoring public. Irene Road is estimated to be completed in September 2023.