Construction Update

Brattleboro NH PC 25(6)

Brattleboro NH PC 25(5)

Brattleboro-Putney PS 25(11)

DATE: Friday, November 7th, 2025


TRAFFIC IMPACTS:


Brattleboro NH PC 25(6)

Nighttime single-lane closures controlled by flaggers will be present as needed from Monday night through Saturday morning, 7:00 p.m. to 6:00 a.m. Work is finishing up on Vermont Route 9 (Western Avenue and High Street), U.S. Route 5 (Main and Canal Street), and Vermont Route 30 (Linden Street). Motorists should watch for wet paint.


Brattleboro-Putney STP PS 25(11)

Work is finishing up on U.S. 5 (Putney Road) from the intersection with Vermont Avenue to Noah's Lane. Nighttime single-lane closures will be in place as needed Monday night through Saturday morning from 7:00 p.m. to 6:00 a.m. with flaggers present to direct one-way alternating traffic through the work zone. Motorists should watch for wet paint.


Daytime single-lane closures are scheduled to continue next week on U.S. 5 in Dummerston and will progress toward Putney. Flaggers will direct alternating traffic patterns through the work zones.


Ditch line work on U.S. 5 in Dummerston.

PARKING IMPACTS:


Overnight parking restrictions throughout downtown may be enforced during working hours in areas where paint has not yet been applied. From 7:00 p.m. to 6:00 a.m. Monday night through Saturday morning, construction operations are scheduled in multiple locations throughout the project. To see alternative lots with rates and hours, please go to https://brattleboro.gov/parking.

CONSTRUCTION ACTIVITIES:


Brattleboro NH PC 25(6)

The Class 1 paving project is finishing up throughout downtown. Crews are finishing up permanent pavement markings and anticipate this operation to be complete next week.


Brattleboro-Putney STP PS 25(11)

Between Vermont Avenue and Noah's Lane, any remaining permanent pavement markings will be completed next week.


Crews are making progress cleaning out the ditch lines on U.S. 5 during the day. They plan to continue this work until the first weekend in December.


To view and share this email as a webpage, please utilize the link below:


View as Webpage

LOCATION:

This contract is a composite of three separate paving projects with detailed locations listed below. It includes all Class 1 limits of Brattleboro which are typically noted by a sign stating "State Highway Ends" and "State Highway Begins". Work to be done on these projects includes coarse milling (grinding off the top layers of pavement) to a depth of 2 inches and paving a ½ inch leveling course and then a 1 ½ inch top course of asphalt. ADA evaluation of sidewalk and pedestrian crossings, sign replacement, guardrail repair and replacement, center line rumble strip location evaluation and installation, drainage work, and other highway improvements are also planned as a part of these projects.


Brattleboro PC25(5)

VT 9: The project begins at Edward Heights intersection and extends approximately 1.7 miles east to the I-91 Exit 2 interchange.


Brattleboro PC25(6)

U.S. 5: The project begins at the intersection with Generous Street and extends approximately 1.9 miles north to the Vermont Avenue intersection.


VT 9: The project begins at I-91 Exit 2 interchange and extends approximately 1.0 mile east to the intersection with U.S. 5 at the traffic signal.


VT 30: The project begins at the U.S. 5 and VT 30 interchange and follows VT 30 three tenths of a mile north to approximately the intersection with Cedar Street.


VT 142: The project begins at the Class 1 limit sign just south of the railroad tracks near Riverside Drive and follows VT 142 north to the intersection with U.S. 5 at the traffic signal, skipping over the newly paved portion of VT 142 completed for the Brattleboro-Hinsdale bridge project.


Brattleboro-Putney STP PS25(11)

U.S. 5: The project begins on U.S. 5 in Brattleboro at the “State Highway Begins” sign at the intersection with Vermont Avenue and extends northerly along U.S. 5 for approximately 8.0 miles to just north of the Putney Landing Road intersection in Putney. Work will also take place within the roundabout and from the roundabout east to the New Hampshire state line on VT 9.


BRATTLEBORO NH PC25(6) INTERIM COMPLETION: Fall 2025


OVERALL PROJECT COMPLETION: Fall 2026

Contact Information:

Name - Bethany Oprendek

Phone - 802.267.4044

Email - bethany@bbo-enterprises.com