|
DATE: Friday, September 25, 2026
Overnight work is planned for tonight Friday, September 25, 2026 from 7 p.m. to 6 a.m.
TRAFFIC IMPACTS:
Vermont Route 9: (Night Work)
Single-lane closures with alternating traffic patterns controlled by flaggers are planned from the Exit 2 interchange to the Edward Heights intersection from 7 p.m. to 6 a.m. Monday night through Saturday morning. No street-side parking will be available through the work zone. Motorists should watch for wet paint.
U.S. Route 5: Brattleboro (Night Work)
From 7 p.m. to 6 a.m. Monday night through Saturday morning, single-lane closures will be in place on U.S. 5 from the intersection with Noah's Lane through the Exit 3 roundabout to the Old Ferry Road intersection. Flaggers and uniformed traffic officers will assist traffic through alternating traffic patterns.
U.S. Route 5: Brattleboro-Putney (Day Work)
Monday through Friday from 6:30 a.m. to 3:30 p.m. single-lane closures will be in place as needed on U.S. 5 on the bridge over Interstate 91 between Bennett Drive and Old Ferry Road. Flaggers will control alternating traffic patterns through the work zones.
|