Construction Update

Brattleboro-Putney PS 25(11)

Brattleboro NH PC 25(5)

Brattleboro STP PC 25(6)


DATE: Friday, November 6, 2026


NO overnight work is scheduled for tonight,

Friday, 11/6 or Sunday, 11/8.


Crews will be off the road by Tuesday, 11/10 at 4 p.m. and return to work Thursday 11/12 at 6 a.m. in observance of the Veteran's Day Holiday.


TRAFFIC IMPACTS:


U.S. Route 5: Brattleboro-Putney (Day work)

With the exception of Wednesday, single-lane closures will be in place on U.S. 5 on the bridge over Interstate 91 between Bennett Drive and Old Ferry Road from 7 a.m. to 3:30 p.m. Monday through Friday. Flaggers and uniformed traffic officers will control alternating traffic patterns through the work zone. Delays are anticipated through the work zone.


U.S. Route 5, Vermont Route 9, and Downtown Brattleboro (Night work)

Mobile work zones and single-lane closures will be in place as needed from 7 p.m. to 6 a.m. Monday, Thursday, and Friday nights throughout the West Brattleboro project limits, the U.S. 5 project limits from Noah's Lane to Old Ferry Road, and on the Class 1 limits of VT 9, U.S. 5, Vermont Route 30, and Vermont Route 142. Motorists should remain vigilant through the work zones.

Pavement markings applied by hand (Fig. 1) and vacuum truck cleanout of drainage system (Fig. 2).

CONSTRUCTION ACTIVITIES:


U.S. Route 5: Brattleboro-Putney (Day Work)

Crews are continuing to work on the I-91 overpass between Old Ferry Road and Bennett Drive. Concrete repair work has concluded and the bridge is scheduled to be milled and paved on Monday and Tuesday next week. Final paint and bridge joints are planned once pavement operations are complete. Other clean up operations are also scheduled.


U.S. Route 5, Vermont Route 9, and Downtown Brattleboro

The paint crews are finishing touch-up paint throughout the entire project limits next week during night shifts on Monday, Thursday, and Friday. Crews will also be completing final work items, including removing signs and various clean-up items, throughout the project.


To view and share this email as a webpage, please utilize the link below:


View as Webpage

LOCATION:

This contract is a composite of three separate paving projects with detailed locations listed below. It includes all Class 1 limits of Brattleboro which are typically noted by a sign stating "State Highway Ends" and "State Highway Begins". Work to be done on these projects includes coarse milling (grinding off the top layers of pavement) to a depth of 2 inches and paving a ½ inch leveling course and then a 1 ½ inch top course of asphalt. ADA evaluation of sidewalk and pedestrian crossings, sign replacement, guardrail repair and replacement, center line rumble strip location evaluation and installation, drainage work, and other highway improvements are also planned as a part of these projects.


Brattleboro PC25(5)

VT 9: The project begins at Edward Heights intersection and extends approximately 1.7 miles east to the I-91 Exit 2 interchange.

Brattleboro-Putney STP PS25(11)

U.S. 5: The project begins on U.S. 5 in Brattleboro at the “State Highway Begins” sign at the intersection with Vermont Avenue and extends northerly along U.S. 5 for approximately 8.0 miles to just north of the Putney Landing Road intersection in Putney. Work will also take place within the roundabout and from the roundabout east to the New Hampshire state line on VT 9.

Brattleboro PC25(6) - Substantially Complete in 2025

U.S. 5: The project begins at the intersection with Generous Street and extends approximately 1.9 miles north to the Vermont Avenue intersection.


VT 9: The project begins at I-91 Exit 2 interchange and extends approximately 1.0 mile east to the intersection with U.S. 5 at the traffic signal.


VT 30: The project begins at the U.S. 5 and VT 30 interchange and follows VT 30 three tenths of a mile north to approximately the intersection with Cedar Street.


VT 142: The project begins at the Class 1 limit sign just south of the railroad tracks near Riverside Drive and follows VT 142 north to the intersection with U.S. 5 at the traffic signal, skipping over the newly paved portion of VT 142 completed for the Brattleboro-Hinsdale bridge project.


OVERALL PROJECT COMPLETION: Fall 2026

Contact Information:

Name - Bethany Oprendek

Phone - 802.267.4044

Email - bethany@bbo-enterprises.com