The Mission Statement of Hope Lutheran Church is “To Know Christ and to Make Christ Known.” We are carrying out Christ’s Great Commission by reaching out to all people to bring them to faith in Christ.

 

Hope Lutheran South Campus Building Project



The Hope Lutheran Strategic Planning Committee has spent many hours working with the Steering Committee and several subcommittees to identify the future facility needs to support our mission and vision. We are in the preliminary stages of this process which has involved data gathering, planning discussions and authorizing Dickerson Architects to prepare preliminary design drawings and cost estimates.


We are committed to:


AESTHETICS


Exterior elevations & architectural features and forms say “church”--Visually prominent Bell Tower and Cross expressing church symbolism--Take advantage of site views and vistas--Maximize our potential to connect to the Florida outdoor environment actively and visually with outdoor spaces.


EFFICIENCY AND EFFICACY


Each space must demonstrate the ability to change with the needs of the parishioners.


MULTI-USE SPACES


Every room must be designed with flexibility in mind. Church spaces are often only used on Sundays, and only by those who already worship there. Creating a diverse range of multi-purpose rooms allows for maximum efficiency. Depending on current need, with a quick shift of furniture, these spaces can easily be utilized for casual fellowship, choir practice, education and more. The narthex and courtyard allow worshippers to gather before the service. A cafe, comfortable seating, and access to literature that the congregation can enjoy prior to joining together in the multi-purpose space enhances the worship experience.


FELLOWSHIP SPACES


Our church must speak to its worshippers and reflect the community that it exists in. Providing casual gathering areas both inside and outside is one way to invite the community in. Courtyards and pavilions allow families to enjoy the church outside of ministry on Sunday. If people enjoy our church for non-worship events, they are more likely to return for church services.


DIGITAL INTEGRATION


Technology has influenced the church permanently and demands wi-fi connections and global connectedness as churchgoers become increasingly tech-savvy. Our church will consider the use of the latest technology to leverage our ability to reach as many worshipers as possible.


Our approach:

MULTIPLE PHASE MASTER PLAN

Phase 1: Activity Center:

  • Approximate size 1,500 SF 
  • Budget: Building:  $300,000 Total $400,000
  • Women’s and Men’s Rest Rooms
  • Area to display information of present and future activities
  • Private counseling room
  • Multi-purpose room
  • Seating capacity of 35 in movable chairs
  • Other Functions
  • Meetings, Bible study, book club, craft area
  • Audio/visual capability (big screen tv): movies, video messages etc.
  • Refreshment Center
  • Refrigeration, Ice maker & beverage dispenser area
  • Microwave/warming area
  • Sink and clean-up area
  • Food window(s) – access to interior spaces and exterior porch
  • Counter area for food preparation
  • Mechanical, electrical, alarm and communication area
  • Custodial support area with storage 


Phase 2 Church:

  • Approximate size 25,000 SF 
  • Budget: Building: $5,000,000 Total $8,000,000
  • Building 1
  • Worship Center  seating for 450
  • Narthex
  • Coffee Bar refreshment area
  • Choir Rehearsal/Multi-purpose space
  • Sacristy
  • Commercial Kitchen space
  • Building 2
  • Administration space
  • Reception/Foyer 
  • Pastor’s Office
  • Conference Room
  • Workstations for 4
  • Work/Copy Area
  • Educational spaces
  • Approx. size of rm 203 @ Central
  • Additional space available in Activity Center, Choir Rehearsal and Worship Center
  • Courtyard
  • Vehicle parking capacity 250 or per code
  • Golf cart parking capacity 100


The Activity Center: small permanent multi-purpose building of approximately 1500 sf to provide a presence and fellowship space at the South Campus as soon as possible with the Activity Center in use and functioning during the construction of the Main Church Project and into the future.

Screen Shot 2022-03-15 at 4.12.42 PM.png

Main Church : permanent church campus/complex with an initial 2 Building-Courtyard concept of approximately 25,000 sf with expansion options, including the construction of a third building as the need may arise in the future.

What is next:

The preliminary plans from Dickerson Architects for the Phase 1 Activity Center and the Phase 2 Church Building Project have been reviewed by the Strategic Planning Committee and the Church Council.


Mark your calendar!

The plans will be shared with the Congregation on March 20 to gather input, feedback, comments, and suggestions.