CONSTRUCTION UPDATE

Week of September 7, 2026

 

Roadway Closure Moratorium


In observance of Labor Day, there will be no roadway closures from Friday night, September 4, through Tuesday afternoon, September 8.


Normal construction activities and roadway closures will resume on Tuesday, September 8.


As you travel this holiday weekend, plan ahead for extra traffic congestion and always arrange a safe ride—never drink and drive.

 

Project Overview

The California Department of Transportation (Caltrans) is making improvements to Interstate 405 (I-405), between Interstate 5 (I-5) and Harbor Boulevard. The project will improve safety for all modes of travel, increase the life expectancy of pavement, enhance traffic operations, and mitigate congestion.

Project Improvements

Enhance safety for traveling public and maintenance crews.


Repair and replace concrete slabs, lanes, traffic loop detectors, and bridge rehabilitation.


Traffic management system improvements, including ramp and roadway enhancements, and an updated metering system.


Irrigation and landscape enhancements.


NEW! Park and Ride facility located on Bristol Street at SB I-405.

Contact Us

Email:

Info@revivethe405.com


Helpline:

714-868-6998


Website:

www.ReviveThe405.com

 

Northbound I-405 Tree Removal and Landscaping


Due to the new traffic configuration and the reduced distance between live traffic and the outside shoulders, trees along northbound I-405 from Jeffrey Road to Culver Drive must be removed to maintain safe conditions for motorists.


Trees will be replaced with new, safer plants and landscaping.


This work will take place daily for approximately one week, from 9 a.m. to 2 p.m.

Nightly lane, ramp, and connector closures are anticipated Tuesday night, September 8, through Friday night, September 11, from 9 p.m. to 5 a.m.*


*Construction schedule is subject to change.

Crews are conducting striping, paving, and maintenance activities at night on northbound (NB) and southbound (SB) I-405. These activities require nightly intermittent lane, ramp, and connector closures.


Please be advised that this work may be loud. Follow detour signs in place to navigate around closures.

Intermittent Freeway Lane Closures:

  • NB I-405 from Sand Canyon Avenue to Harbor Boulevard
  • SB I-405 from MacArthur Boulevard to I-5


Intermittent Ramp Closures*:

  • NB I-405 on-ramp from WB Irvine Center Drive
  • NB I-405 off-ramp to Jeffrey Road
  • NB I-405 on-ramp from WB Culver Drive
  • NB I-405 loop on-ramp from EB Culver Drive
  • NB I-405 off-ramp to Culver Drive
  • NB I-405 on-ramp from WB Culver Drive
  • NB I-405 loop on-ramp from EB Culver Drive
  • NB I-405 off-ramp to Culver Drive
  • NB I-405 on-ramp from WB Jamboree Road
  • NB I-405 loop on-ramp from EB Jamboree Road
  • NB I-405 loop on-ramp from WB MacArthur Boulevard
  • NB I-405 off-ramp to MacArthur Boulevard
  • NB I-405 on-ramp from WB Bristol Street
  • NB I-405 loop on-ramp from EB Bristol Street
  • NB I-405 loop on-ramp from EB Bristol Street
  • NB I-405 off-ramp to Bristol Street
  • NB I-405 on-ramp from Fairview Road
  • SB I-405 off-ramp to University Drive 
  • SB I-405 loop on-ramp from EB Jeffrey Road/University Drive
  • SB I-405 on-ramp from WB University Drive/Jeffrey Road
  • SB I-405 off-ramp to Culver Drive
  • SB I-405 loop on-ramp from WB Culver Drive
  • SB I-405 on-ramp from EB Culver Drive
  • SB I-405 off-ramp to Culver Drive
  • SB I-405 loop on-ramp from WB Culver Drive
  • SB I-405 on-ramp from EB Culver Drive
  • SB I-405 off-ramp to Jamboree Road
  • SB I-405 loop on-ramp from WB Jamboree Road
  • SB I-405 on-ramp from EB Jamboree Road
  • SB I-405 off-ramp to MacArthur Boulevard
  • SB I-405 on-ramp from EB MacArthur Boulevard
  • SB I-405 loop on-ramp from WB Bristol Street


Intermittent Connector Closures:

  • NB I-405 Connector to NB SR-55
  • NB I-405 Connector to Susan Street
  • NB SR-55 Connector to SB I-405
  • NB I-405 Connector to SB SR-133
  • NB SR-133 Connector to NB I-405
  • NB SR-133 Connector to SB I-405
  • SB I-405 Connector to NB SR-55
  • SB SR-55 Connector to NB I-405
  • SB SR-55 Connector to SB I-405
  • SB I-405 Connector to SB SR-133
  • SB I-405 Connector to NB SR-133
  • SB SR-133 Connector to SB I-405


* Consecutive ramps will not be closed at the same time.

 