Capital Improvement Program Construction Brief
June 2018
|
|
Water Supply Program: Quarry/Chattahoochee/Hemphill
|
Update:
The tunnel boring machine (TBM) has mined approximately 15,600 ft.
On average, the TBM mines approximately 60 ft. per day.
The tunnel boring machine has reached the three mile mark. Two miles of tunneling remains to complete the five mile path to reach the Chattahoochee River. Controlled blasting is necessary to complete the construction shaft and a short tunnel connecting the shaft to a proposed Chattahoochee River Intake pump station.
The Water Supply Program will increase Atlanta’s reserve water supply from three to five days to 30 to 90 days. The $300 million investment includes the construction of a five-mile tunnel connecting the Chattahoochee River, the Hemphill Water Treatment Plant, and the former Bellwood Quarry, which will be transformed into a 2.4 billion gallon reservoir. The Water Supply Program is scheduled for completion by September 2019.
Expected Completion: 9/2019
Project Location: Northwest Atlanta
Council District(s): 3, 9
Neighborhood Planning Unit(s): C, D, G, J, K
|
|
Upper Proctor Creek Capacity Relief Project:
Rodney Cook Sr. Park in Historic Vine City
|
|
Update:
Contractors are working to remove the last stock pile of dirt for the main remediation before pipe installation.
The project is designed to help alleviate flooding while providing increased green-space in Vine City. The project consists of installing a new capacity relief storage facility in the area, installing 2,200 linear feet of 60-inch capacity relief trunk line, re-routing 1,100 LF of 96-inch combined trunk sewer by installing pipeline in the right-of-way along street in the Vine City area and remediating and relocating sewers.
Expected Completion: 12/2018
Project Location: Northwest Atlanta
Council District(s): 3
Neighborhood Planning Unit(s): L
|
|
R.M. Clayton Sand Filter Media Installation and
Refurbishment Project
|
|
Update:
A certificate of substantial completion was established May 18. A detailed punch list was generated for contractors on June 4 with all items to be addressed by July 27. All 22 filters are in active operation with final acceptance upon completion of the punch list is anticipated no later than August 5.
The R.M. Clayton WRC treatment process removes biological and chemical impurities from the wastewater in three phases: primary treatment, secondary treatment and tertiary treatment. Primary sludge and biological solids that are removed during the wastewater treatment process are reduced in the digestion process before being dewatered and incinerated or hauled to a landfill. This project will restore the effectiveness of the filtration process, reduce the backwash frequency and duration, reduce the maintenance costs and improve overall plant reliability in meeting permit limits. The project is estimated to be completed in June 2018.
Expected Completion: 6/2018
Project Location: R. M. Clayton Water Reclamation Center
Council District(s): 9
Neighborhood Planning Unit(s): D
|
|
Boone Boulevard Green Infrastructure & Capacity Relief Project
|
|
Update
: Contractors will perform signal work and temporary lane restriping, requiring lane closures on Joseph E. Boone Boulevard between Northside Drive NW and Sunset Avenue NW. The traffic signal at Sunset Avenue NW will be removed and replaced with a four-way stop. The traffic signal at Vine Street NW will be removed and replaced with a one-way stop on the north side of the street.
The temporary lane restriping is scheduled to occur Tuesday, June 12 between 7 a.m. and 7 p.m. One lane will remain open on Boone Boulevard for motorist traveling east and west. Once the signal and lane restriping work is complete, eastbound and westbound traffic will be shifted to the north side of Boone Boulevard until construction work on the south side of the roadway is complete. Traffic control measures will be in place to guide motorists around the work zone. Motorists are urged to use caution in the area.
Water mains are tentatively scheduled to be replaced in the second quarter of 2018 on Joseph E. Boone Boulevard NW between Northside Drive NW and Mayson Turner Road NW.
Stormwater planter boxes, sidewalks, driveway aprons and tree installations have been completed along the southern side of Joseph E. Boone Boulevard NW between Joseph E. Lowery Boulevard NW and Sunset Avenue NW. Now under the project, DWM will replace water mains on Joseph E. Boone Boulevard NW between Northside Drive NW and Mayson Turner Road NW. Water main replacement work is currently tentatively scheduled to begin early 2018.
Expected Completion: TBD
Project Location: Northwest Atlanta
Council District(s): 3
Neighborhood Planning Unit(s): K, L, M
|
|
Cascade Road Water Main Installation
|
|
|
|
Update:
Crews are performing leak repairs and concrete work on Cascade Road SW.
Crews installed an eight-inch water main on Cascade Road SW between Childress Drive SW and
Beecher Street SW.
Expected Completion: 6/2018
Project Location: Southwest Atlanta
Council District(s): 4, 10, 11
Neighborhood Planning Unit(s): S, R, I
|
|
Clear Creek West Sewer Improvements Project
|
|
Update:
Contractors are currently conducting soil and water tests and analyzing the samples. In addition, crews will continue laying foundation, building walls, decking and installing rebars.
The City of Atlanta's Department of Watershed Management has identified the need for an underground storage vault to be installed to increase the storage capacity of the existing combined sewer system in the Clear Creek West basin.
The vault associated with this project is located in the southeastern corner of the existing Civic Center parking lot adjacent to Ralph McGill Boulevard. The Butler Street trunk and relief combined sewers drain the upper section of the west Clear Creek basin. During certain rainfall events this system can become surcharged, which may result in flooding. The storage vault will store excess combined sewer flows from the Butler Street Relief Combined Sewer, which intercepts the Butler Street Trunk Combined Sewer at the
I-75/85 entrance ramp from Freedom Parkway and Highland Avenue. Stored combined sewer flow in the vault will reduce the peak flow in the downstream combined sewer helping to reduce flooding.
This stormwater vault will help manage rainfall runoff from the adjacent federal highways and downtown portions of the basin. Additionally, implementation of green infrastructure projects are proposed to further manage combined sewer peak flows to the combined sewer system and to reduce the required capacities of the vaults.
Expected Completion: 7/2018 (Design Phase)
Project Location: Northeast Atlanta
Council District(s): 2
Neighborhood Planning Unit(s): M, E
|
|
Clear Creek Combined Sewage Control Facility
Package 1, Chemical System Improvements and Flow Monitoring
|
|
Update:
Refurbishment of two storage tanks at Clear Creek CSCF is complete. The remaining two tanks are scheduled to be refurbished in June. Contractors are finishing Phase 1 of installation of new chemical feed piping at the Clear Creek Combined Sewer Control Facility (CSCF). A manhole has been set to install a flow meter at the CSCF at Tanyard Creek. The drum screen at Custer Avenue CSCF has also been rebuilt. The project is approximately 35% complete.
Clear Creek Combined Sewage Control Facility (CSCF), one of the combined sewer control systems owned and operated by the City, is located in the west service area. During large storm events, when the capacity of the tunnels and the West Area WQCF is exceeded, the combined flows enter the Clear Creek CSCF and the combined wastewater is treated through coarse bar screening and fine drum screening, disinfected with sodium hypochlorite (NaOCl) and dechlorinated with sodium bisulfite. Upgrades to the NaOCI storage tanks, pump and piping system will improve system reliability. Various improvements to other water quality control facilities (WQCF) are included in the project.
Expected Completion: 3/2019
Council District(s): 2, 3, 5, 6, 7, 8, 9
Neighborhood Planning Unit(s): A, B, D, E, F, G, H, K, M, O
|
|
Neighborhood Planning Unit (NPU)
The City of Atlanta is divided into 25 Neighborhood Planning Units (NPU), which serve as citizen advisory councils that make recommendations to the Mayor and City Council on zoning, land use, and other planning issues. NPUs also allow citizens to receive information about all functions of city government.
|
|
See neighborhoods located within listed NPUs below:
|
|
NPU-B
- Brookhaven
- Buckhead Forest
- Buckhead Village
- East Chastain Park
- Garden Hills
- Lenox
- Lindbergh/Morosgo
- North Buckhead
- Peachtree Heights East and West
- Peachtree Hills
- Peachtree Park
- Pine Hills
- Ridgedale Park
- South Tuxedo Park
NPU-C
- Arden/Habersham
- Argonne Forest
- Brandon
- Castewood
- Channing Valley
- Collier Hills
- Collier Hills North
- Colonial Homes
- Cross Creek
- Fernleaf
- Hanover West
- Memorial Park
- Peachtree Battle Alliance
- Ridgewood Heights
- Springlake
- Wesley Battlle
- Westminister/Milar
- Westover Plantation
- Wildwood
- Woodfield
- Wyngate
NPU-D
- Berkley Park
- Blandtown
- Bolton
- Hills Park
- Riverside
- Underwood Hills
- Whittier Mill Village
NPU-G
- Almond Park
- Atlanta Industrial Park
- Bolton Hills
- Brookview Heights
- Carey Park
- Carver Hills
- Chattahoochee
- English Park
- Lincoln Homes
- Monroe Heights
- Rockdale
- Scotts Crossing
- West Highlands
|
|
NPU-J
- Center Hill
- Dixie Hills
- Grove Park
- Harvel Homes
- Penelope Neighbors
- West Lake
NPU-K
- Bankhead
- Hunter Hills
- Knight Park/Howell Station
- Mozley Park
- Washington Park
NPU-L
NPU-M
- Castleberry Hill
- Downtown
- Old Fourth Ward
NPU-P
- Arlington Estates
- Ashley Courts
- Ben Hill
- Brentwood
- Briar Glen
- Butner/Tell
- Cascade Green
- Deerwood
- Fairburn
- Greenbriar Village
- Heritage Valley
- Huntington
- Kings Forest
- Lake Estates
- Meadowbrook Forest
- Mellwood
- Mt. Gilead Woods
- Niskey Cove
- Niskey Lake
- Princeton Lakes
- Wildwood Forest
NPU-S
- Bush Mountain
- Cascade Avenue/Road
- Fort McPherson
- Oakland City
- Venetian Hills
- Westmont Estates
|
|