|
Construction will create changes to entries,
walkways and parking on the Cheraw Campus.
Access on the east side of campus can be made through the 200 Building, the 300 Building gate and the east entrance of the 500 Building. The construction area will block access and parking at the 800 Building and west side of the 500 Building.
|