DATE ISSUED: Thursday, February 20, 2025

Project Abutter Meeting

Champlain Parkway - Final Contract

Pine Street (north)

Thursday, March 13

6 PM

The City of Burlington Department of Public Works (DPW) awarded the final contract of the Champlain Parkway Project to Engineers Construction Inc. (ECI) in August 2025. This 2.8-mile project will connect I-189 to the City’s South End, alleviate neighborhood traffic, and transform the existing road into a two-lane multi-modal roadway.


The final contract includes the construction of the Champlain Parkway between Home Avenue and I-189 and improvements to Pine Street between Kilburn Street and Main Street. Work on the final contract began in January 2025 along the unused section of the previously constructed Southern Connector. This work will continue through June 2026. Work on Pine Street (north) is anticipated to begin in April 2025 with major work completed by December 2025.


Improvements to Pine Street (north) include drainage upgrades, new granite curb, pavement, line striping, permanent roadway signage, pedestrian accommodation improvements, the installation of new traffic signals at Maple and King Streets, and upgrades to the existing traffic signal at Main Street. This work will be completed predominately on weekdays between the hours of 7 AM – 7 PM with potential night and weekend work if needed. This work will require temporary block segment road closures with short detours and instances of one-lane with alternating one-way traffic. Some work will require temporary driveway width reductions and sidewalk closures. Pedestrian detours will be signed. Access to businesses and residences will be maintained. 

The Burlington DPW invites you to attend a hybrid public meeting for the final contract of the Champlain Parkway Project. This meeting will focus on the improvements to the section of Pine Street between Kilburn Street and Main Street. A separate abutter meeting was held on December 12, 2024, for the work to construct the Champlain Parkway connection between Home Avenue and I-189.


Abutter Meeting

Thursday, March 13, 2025

6 PM

Join us in person:



Department of Public Works Building

Front Conference Room


645 Pine Street

Burlington, VT


Join remotely:

Zoom Webinar Link

Webinar ID: 941 7448 1936

Passcode: 996912

To dial in by phone, please call:

1-312-626-6799

The DPW will work to secure interpretation services in Maay Maay, Nepali, Swahili, and Somali by request. Please reach out to info@champlainparkway.com to request these services by March 11.

The Abutter Meeting will include a presentation reviewing the improvements, construction activities, potential impacts, and schedule of the work along Pine Street between Kilburn Street and Main Street. Project team members will be available to answer questions and address concerns.


We look forward to seeing you there!

PROJECT LOCATION:

The Champlain Parkway Project spans a 2.8-mile area from the I-189 intersection with US 7 to Lakeside Avenue, and includes upgrades to Lakeside Avenue, and improvements to the section of Pine Street between Lakeside Avenue and Main Street. 

The initial contract, conditionally accepted in December 2024, included the construction of the Champlain Parkway from Home Avenue to Lakeside Avenue, upgrades to Lakeside Avenue, and improvements to the section of Pine Street between Lakeside Avenue and Kilburn Street.



The final contract, broke ground in January 2025, includes the construction of the Champlain Parkway from existing I-189 near its intersection with U.S. Route 7 to Home Avenue, and the section of Pine Street between Kilburn Street and Main Street. 

PROJECTED COMPLETION:

Initial Contract 2024

Final Contract 2026

NEARBY CONSTRUCTION PROJECT ALERT:

The Burlington Department of Public Work maintains a construction detour map containing traffic impacts including traffic restrictions, roadway closures, and more for all major construction projects in the Downtown District and the South End. Plan your travel with the most up to date information by using the detour map linked below.

Burlington DPW Detour Map

Work continues on a neighboring construction project, the Burlington Great Streets: Main Street Project – Phase 1. The first phase of this project includes the full reconstruction of Main Street between Pine Street and South Winooski Avenue – shifting curb lines, subsurface utilities, signals, new sidewalks and off-street bicycle facilities, and streetscape elements. This work is anticipated to continue through November 2026. For additional information on the project or to view the latest construction updates and traffic impacts, visit the project website by using the link below.

Burlington Great Streets: Main Street

CONTACT US:

For more information about the project please visit the project website champlainparkway.com or contact the project team via the project hotline, 802-496-8956 or by email: info@champlainparkway.com.

Project Website
Join Our Mailing List
Facebook  Twitter