The Chino Basin Program addresses local and state water challenges by investing in local water treatment, storage, and delivery.


This quarterly Program Bulletin is your source to learn more about an exciting partnership designed to increase local water supply reliability and regional resiliency.

Preparing for Drier Years Ahead: Why Aquifer Storage Matters

As California moves through 2026, water managers and communities are facing growing concern about drought conditions returning to much of the state. While California is no stranger to cycles of wet and dry years, long-term trends show rising temperatures, more variable precipitation, and earlier snowmelt—all of which increase the risk of prolonged droughts. Projections show that continued water demands could create severe water scarcity conditions by 2040 due to longer and more frequent droughts. As a State Water Project dependent agency, IEUA faces significant pressure during times of severe drought, especially when water supplies from the northern part of the state are constrained.


One of the most effective tools for building resilience in these conditions is storing water underground in our aquifers. The Chino Basin Program (CBP) will construct a state-of-the-art Advanced Water Purification Facility (AWPF) capable of producing 15,000 acre-feet per year of purified recycled water. This water will be stored in the Chino Basin using aquifer replenishment wells and can be extracted by our partner agencies to continue providing reliable water to customers.


Looking ahead, investing in aquifer storage and recharge will be increasingly critical for our region’s water future. This program will improve groundwater quality affected by salts, nitrates, and other contaminants, enhance long-term sustainability of local water resources, and provide flexibility during extended droughts. By purifying and storing water, IEUA can better prepare for drought years—ensuring greater reliability, flexibility, and resilience in the decades to come.

Construction Started on Demonstration Facility

The Advanced Water Purification Demonstration Facility is set to open to the public in the Spring of 2027.


Slated to process approximately 90 gallons per minute, the Demonstration Facility operations will provide valuable performance data to improve design of the full-scale facility. Key goals of the project include:


  • Testing and refining high-recovery reverse osmosis (RO) processes under variable source water conditions.


  • Validating sizing requirements for the treatment processes


  • Optimizing design parameters for equipment selection for the full-scale AWPF to ensure efficiency and sustainability.


  • Training plant operators in advanced treatment technologies.
    
  • Educating the community through tours and outreach events for the public, member agencies, and regulatory partners.


Below are 3D renderings of the facility’s interior and planned technology will look like. Keep an eye on our website and in upcoming bulletins for information about taking tours once we are up and running next year!

This is the Membrane Filtration testing four different ultrafiltration membranes and tanks for the clean in place systems.

Reverse Osmosis and Ultraviolet Advanced Oxidation Process

Check out our video celebrating the start of construction:

 

Recent News


April 2026

IEUA’s Board of Directors appointed Kevin Alexander as the new General Manager, effective April 16. He brings over three decades of experience focused on water, wastewater, recycled water planning, engineering, and operations, growing through his career to lead private sector business and public agency management. His broad background is a perfect fit for IEUA’s complex and innovative water supply, wastewater treatment, and recycling programs. Prior to his current role, Mr. Alexander served as IEUA’s Deputy General Manager.


May 2026

In May, IEUA submitted the 1211 Wastewater Change Petition to the State Water Control Board. This is a vital step in being able to explore new uses for our recycled water and progress with groundwater recharge.


June 2026

Congresswoman Norma Torres visited the construction site for the new demonstration facility to present a check to support the Chino Basin Program. Her support helps us create a facility that is not only technically important, but also public-facing and educational. This space will help residents, students, community leaders, and partners better understand the science behind purified recycled water and the role it can play in our region’s future.

Community Presentations

California Water Commission Meeting



2026 California AGWT-AGWA Groundwater Conference

WateReuse Symposium

WateReuse Symposium

The Biennial Symposium on Managed Aquifer Recharge

Connect With Us

For additional program information, project updates, and opportunities to connect with our staff directly, visit our website at chinobasinprogram.org and follow us on social media.

 
Facebook  Instagram