Our team has already been busy in 2024 responding to the early January storms. We saw some damage to our West Cliff construction sites, but the Granite Construction team is already back to work, and we expect to see project sites wrapping up construction in mid-February and March.
920 West Cliff
- The wall has reached its top elevation.
- This week, the team will be backfilling the back of the wall and placing an 8-ton rip rap at the front and sides of the wall.
932 West Cliff
- The wall is expected to reach its top elevation this week.
- Granite crews will pour concrete for the last section of the concrete wall. This concrete pour will begin at 7:00 AM on Friday, 1/19/24.
1016 West Cliff
- This week, Granite will backfill the adjacent sea cave that collapsed due to the recent storm.
- They will also continue to build formwork for the retaining wall.
1030 West Cliff
- The design team is discussing and reviewing possible wall designs for this site.
The storms also significantly impacted our Santa Cruz Wharf. A determination has yet to be made at the Wharf, and the team is actively conducting evaluations to formulate the appropriate recommendations.
As we embark on this rainy winter season, localized flooding and significant swell events are possible. Stay informed by following us on social media for regular updates. Pay close attention to signage, road closures, and barricades. Your safety is our top priority – make it yours!
|