WINTER 2020
ARIZONA
CIVILTEC NEWS
The Antelope Park Well Equipping project included the design of a 500 gpm pump, site controls, building, plumbing, site development, connection to the Town’s existing 10” water transmission main and electrical controls. The well began construction in May 2019 and was completed in December 2019.
Civiltec Engineering hosted its annual Holiday Party on Dec.12, 2019 at TopGolf in Las Vegas, NV. Employees from the California and Arizona offices traveled to Las Vegas for the event which ran from 12 p.m. to 4 p.m. Employees attending stayed at the MGM Grand Hotel, a half mile away from the TopGolf location.
The Little Pete Well is now online and in production for the Town of Prescott Valley. The well is located in the Town’s North Well Field and is the largest producer of the wells in the area. Little Pete was outfitted with a 500 horsepower turbine motor to pump up to 2500 GPM when in full production.
Please RSVP to our  2020 “Day at the Races”   event which will be held on Saturday, March 21st. We invite you and your family to join us as we celebrate 34 years of business at the Santa Anita Race Track in Arcadia, California from 11:30am to 6:00pm.
We love hearing news from everyone in the Civiltec community.
Feel free to reach out, say hello and tell us all the news from your organization!
Copyright © 202. All Rights Reserved.