WINTER 2022
ARIZONA
STAFF SPOTLIGHTS
Ben Goulet, Engineering Technician EIT
Phoenix
"What drew me to Civiltec was that the company has projects in many different areas. The fact that I wouldn’t be doing the same thing every day really appealed to me. It truly is a well-rounded company. Another thing that drew me to Civiltec is the small company atmosphere."
Raymond J. Buettner III, Senior Designer
Prescott
"At the end of my 4th year of teaching and long chats with Rick, my wife Amy, and lots of prayer, I made the decision to make a total career and life change and came on as a full-time employee with Civiltec as a draftsman. From there I started dabbling in design, going out in the field to do observation on projects and after several years, started managing some projects." 
Civiltec delivered design plans and specifications for the construction of a sidewalk, curb and gutter improvements, curb ramps, drainage improvements, asphalt repair, and chip seal for the Town of Dewey-Humboldt. The Arizona Department of Housing provided the Town with a Community Development Block Grant (CDBG) to fund this project. With Civiltec’s assistance, the sidewalk improvements now provide a safe, off-street walking path to Humboldt Elementary School, improving the quality and functionality of Hill Street for residents and visitors alike.
SMPS is a community of Architecture, Engineering, and Construction (A/E/C) marketing and business professionals who seek to transform the industry through marketing leadership. Christy Sipos will serve as President from September 2022 through August 2023. At Civiltec, Christy has led the firm’s business development and marketing activities for six years, assisting both the California and Arizona offices.
In August 2021, the Town of Chino Valley (Town) unanimously approved Civiltec as the lead consultant for their Municipal Waterline Improvements Project. Design has been completed for a looped water supply line in the Old Home Manor area of the Town, which currently has a 12-inch single water supply line. The new line will be an 18-inch diameter and will provide a second potable water supply to the area to accommodate current and future water demands. 
We love hearing news from everyone in the Civiltec community.
Feel free to reach out, say hello and tell us all the news from your organization!
Copyright © 2021. All Rights Reserved.