|
345 West 145th Street
New York, NY
What began as a routine safety upgrade evolved into a more tailored, forward-looking solution. Initially, driven by an insurance requirement to address electrical panel fire risks, our assessment revealed a broader picture with aging infrastructure and systems operating near or above capacity.
Rather than defaulting to a one for one replacement, we took the time to step back with the client and evaluate the system holistically. By aligning immediate safety needs with long-term goals, the approach began to expand beyond the original scope.
The result was a comprehensive electrical upgrade that improved safety, corrected non-compliant conditions, and expanded system capacity while also preparing the building for future electrification, including a potential transition to electric cooking.
|