WEEK OF OCT. 7, 2019
MOTORIST ALERT:
TRAFFIC SHIFT ON NORTHBOUND I-5
Motorists traveling on northbound I-5 will experience a traffic shift between Oso Pkwy. and La Paz Rd. The northbound lanes were restriped to provide a dedicated work zone along the freeway shoulder so crews may safely work on the I-5 South County Improvement Project. The new, temporary striping consists of six inch white stripes, bordered by two inch black stripes.

The number of freeway lanes were not reduced, however, the shoulder within these limits was temporarily eliminated. Motorists will continue to have access to the carpool lane and four general-purpose lanes throughout the project limits.

Thank you for exercising caution while driving in this area and adhering to the 55 miles per hour speed limit. Traffic fines are doubled in a construction zone.
I-5 LANE AND RAMP CLOSURES
Intermittent lane closures on northbound and southbound I-5 are scheduled between Oso Pkwy. and Alicia Pkwy., 10 p.m. to 5 a.m., nightly. At least two lanes will remain open at all times.

Westbound La Paz. Rd. from Muirlands Blvd. to Cabot Rd. will be reduced to one lane nightly from 11 p.m. to 5 a.m.
DATE/TIME
CLOSURE
Monday, Oct. 7 -
Friday, Oct. 11
10 p.m. - 5 a.m.
La Paz Rd.
Northbound I-5
on- and off-ramps

Southbound I-5 off-ramp

Monday, Oct. 7 -
Friday, Oct. 11
11 p.m. - 5 a.m.

Westbound La Paz Rd.
From Muirlands Blvd. to Cabot Rd.
The duration of this work may change depending on site conditions and are subject to change due to unforeseen operational factors.
ABOUT THE PROJECT
OCTA and Caltrans are working together to improve freeway capacity and operations on a 6.5-mile stretch of I-5 from SR-73 to El Toro Road in south Orange County. This voter-approved $580-million project will add a general purpose lane in each direction of the I-5 between Avery Parkway to Alicia Parkway, extend the second carpool lane from Alicia Parkway to El Toro Road in both directions, reconstruct two interchanges and one bridge, and modify on- and off-ramps. To further improve operations, carpool lanes in the project area will convert to continuous access. The project is expected to be completed in 2025.  
STAY INFORMED
800-724-0353 | OCTA.net/i5South