Construction Update
920 West Cliff
- The wall has reached its top elevation.
- This week, the team will be backfilling the back of the wall and placing an 8-ton rip rap at the front and sides of the wall.
932 West Cliff
- The wall is expected to reach its top elevation this week.
- Granite crews will pour concrete for the last section of the concrete wall on Friday, 1/19/24.
1016 West Cliff
- This week, Granite will backfill the adjacent sea cave that collapsed due to the recent storm.
- They will also continue to build formwork for the retaining wall.
1030 West Cliff
- The design team is discussing and reviewing possible wall designs for this site.
Reminder: barricades are there for your safety! Please never move or go past barricades and stay out of the construction zone.
|