Pouring on Progress


On April 16, GCEP accomplished a project milestone of installing the first underground vault on Linskey Way in Cambridge. On April 28, a second vault was installed on Linskey Way. Soon, crews will excavate to install duct bank conecting the two manholes.


The next vaults to be installed on the project will be off roadway at the corner of Broadway and Third Street at the Volpe parcel. There are 54 total vaults to install on GCEP.

Earth Day Cleanup 2025


Over 25 Eversource employees partnered with the Charles River Watershed Association and the Boston Parks & Recreation Department to participate in an Earth Day cleanup along the Charles River.


They hauled over 50 bags of trash, 6 tires, poles, car parts, and a fridge door. The partnership has become an annual tradition.

Construction Update

May 5 - May 17

City of Cambridge


Approved construction hours in Cambridge


  • Monday to Friday from 7 a.m. to 4 p.m.
  • Occasional activities may be performed beyond these hours or on weekends based on approval from local officials.


Ongoing activities


  • Broadway: Installation of transmission line conduit within the new substation site, off the roadway at 121 Broadway.
  • Third Street: Crews have implemented a traffic shift on Third Street between Linskey Way and Potter Street. Two lanes of travel will be maintained, and on-street metered parking is restricted to allow for duct bank installation on the east side of the roadway. The traffic shift will remain in place for the summer.
  • Excavation activities are ongoing off roadway at the corner of Third Street and Broadway (Volpe parcel) to support the installation of two underground vaults
  • Linskey Way: Excavation activities including preparation for trench digging are ongoing on Linskey Way between Third Street and Second Street.
  • Temporary sidewalk barriers north of the roadway will be maintained to safely secure the work zone in this area. A dewatering system is positioned off the roadway to support upcoming excavation activities.
  • Ames Street: Enabling and preparation activities between Main Street and Memorial Drive to support upcoming vault and duct bank installations this summer.
  • Temporary modifications to the west side of Ames Street including changes to ramps, curbing, and overhead lighting.
  • Excavation to install sleeves to support and protect existing underground utilities.


Anticipated activities


  • Second Street: Excavation activities including trench digging on Second Street between Athenaeum Street and Linskey Way.
  • Galileo Galilei Way: Excavation activities to install underground vaults between Main Street and Broadway.


Traffic Configurations


  • Construction activities will generally be done utilizing lane restrictions or alternating lane traffic patterns. If detours are necessary, clear signage will be posted to direct motorists and cyclists. Please continue to check the project website for updates and postings of traffic plans.
  1. Linkey Way will be one-way, allowing thru traffic from Third Street towards Second Street (west to east). Eastbound motorists will be detoured from Second Street, to Binney Street, to Third Street, to reconnect with Linskey Way. This traffic pattern will continue regularly throughout the summer months.
  2. Ames Street southbound traffic will be detoured at Main Street, to Wadsworth Street. This traffic pattern will continue during daytime work hours through May 15.

City of Somerville / City of Boston


There is no construction planned in Somerville or Boston at this time.

Please continue to check this newsletter for updates.

Click the image below to view our

Interactive Project Map!

Visit the GCEP Website to learn more


Have a question about the Project or its approved routes? Please reply to this email with any questions or to setup a meeting.

Keeping You Informed

Eversource is committed to being a good neighbor and keeping you informed of Project progress.


Stay in Touch

Facebook  Twitter  Instagram  Youtube  Linkedin  
Address: 247 Station Drive
Westwood, MA 02090
Phone: 1-833-836-0302
Email Us