Water Tower Recoating
Work to recoat the Woods Chapel water tower is underway with an expected completion date of June 15, weather permitting.
The City operates and maintains 30 million gallons of water storage as part of the water distribution system. During a recent inspection of the water tower, it was determined that the water tower's steel coating needed to be replaced. The towers are inspected every five years internally and externally for needed repairs.
|