North Millsboro Bypass, US 113 to SR 24
Project Description: This project includes a two-lane connector road between US 113 and SR 24 north of Millsboro. The new alignment will start at US 113 and extend eastward bridging over Fox Run Road, the Norfolk Southern Railroad, the Millsboro Pond, and Gravel Hill Road. The new road will connect to SR 24 west of Mountaire Farms. The project will also consist of a grade-separated intersection at the US 113/SR 20 intersection.
Project Phase: Design/Right of Way
Projected Construction Completion: 2025
Project Update: Design and right-of-way acquisition are underway. The project has been split into two projects consisting of the grade separation and the connector road. Construction is anticipated to begin later this year. Tree clearing will begin this month.
Bridge 3-402 on US113, Scour Countermeasures
Project Description: This project involves placing rip-rap between the footings for the three-sided concrete frame experiencing scour. Rip-rap will be placed at the upstream and downstream openings as well.
Project Phase: Design
Projected Construction Completion: 2024
Project Update: Design is progressing.
*HEP SC, SR 54 at Hudson Road Roundabout
Project Description: This project will install a roundabout at the intersection of SR 54 and
Hudson Road.
Project Phase: Design
Projected Construction Completion: 2026
Project Update: Design is underway.
US 113 Widening, Dagsboro Road to Hardscrabble Road
Project Description: This project will add an additional through lane both northbound and
southbound through the Town of Millsboro from Hardscrabble Road to Dagsboro Road.
Crossover modifications along US 113 will be made throughout the project limits. Multimodal facilities will also be incorporated.
Project Phase: Design
Projected Construction Completion: TBD
Project Update: Design is progressing and a concept plan is expected to be ready this summer.
*HEP – Hazard Elimination Program
|