Dear Strawbridge family:


Interior work on our new building continues with installation of the electrical, air conditioning ductwork and fire sprinkler systems that will be hidden above the suspended ceilings. And as all can see, the exterior is progressing with brick laying complete and siding installation ongoing. It won’t be long now until planned occupancy in May, when renovation of the Children’s area will begin.


The financial campaign had a good year in 2025. As of year-end, we collected nearly $2.6 M of the $3.4 M pledged, or 76%, with a bit over a year yet to go in the 3-year campaign. In addition, we have received $161,000 of the $340,000 estimated in non-pledged donations. This generosity is a testament to our discipleship at Strawbridge.


In the next month we anticipate starting work on the underground stormwater

detention system, commissioning the air conditioning system and starting installation of the ceiling grid and wooden trim and cabinetry.


As always, Bill Koerner, Project Manager, will be happy to answer your questions via email at bill.koerner@gmail.com.


Peace and blessings,

The Embrace the Spirit Team