|
Dear Strawbridge family:
Starting today, Monday, March 9, the Willow Terrace driveway will be closed for three weeks. During this time, please use the Kingwood Drive entrance to our parking lot. Please be patient and careful, particularly during the week when there is significant construction traffic at the Kingwood Drive entrance.
Mission Constructors have provided a temporary sidewalk from Willow Terrace Drive to our parking lot for those that park on the streets or walk to church.
There are two reasons that we are reconstructing the Willow Terrace driveway – to allow connection of our new drainage lines to the city storm sewer system, and to accommodate a level crossing for the new sidewalk along the street. During this time, we will also be installing the underground stormwater detention system in front of the existing buildings – a six-foot in diameter, 180-foot long pipe.
|