Q2 UPDATE – STILL BUILDING WHAT LASTS

As we close out Q1, water, sewer, and stormwater infrastructure projects across North America have kept teams busy; from manufacturing through field services, and engineering support.


Aging infrastructure, along with increasing demands on flood control and stormwater systems, remains a key focus across the industry.

After years of development, we’re excited to announce the launch of our latest T-Storm stormwater management system. We invite you to visit our demo installation at our Alvarado plant to see it in action - reach out to enigneer James Mayer tstorm@one-tpg.com or view our on demand presentation here


We’ll be attending several key industry events in the coming months—connect with us here:


NAT | (Anaheim, CA) – June 15–18 | Book a 1-on-1 trenchless@one-tpg.com

AWWA ACE | (Washington, DC) – June 21–24 lead@one-tpg.com

ASCE Pipelines | (Detroit, MI) – August 1–5 trenchless@one-tpg.com

 

From Race Track to Plant Floor


The Sam Hunt Racing team recently visited the plant, creating an opportunity to connect the crew behind the car with the team behind the pipe. Driver Dean Thompson even stepped back into familiar territory, showcasing his welding skills after previously working at the plant as a teen.


Upcoming Races:

• June 20 — San Diego Street Race, CA (Naval Base Coronado)

• June 27 — Sonoma Raceway, CA

• July 4 — Chicagoland Speedway, IL

 

Project Snapshots

Emergency Sliplining Rehabilitation | Miami-Dade, FL

The project highlights how trenchless rehabilitation can successfully address complex technical, operational, and constructability challenges associated with large-diameter pipeline infrastructure.


A critical 72-inch PCCP raw water main serving more than 2.8 million residents required emergency rehabilitation under stringent operational constraints, including maintaining uninterrupted service through a parallel transmission main.

Trenchless FRP sliplining was selected to restore long-term reliability while minimizing disruption, reducing construction risk, and avoiding extensive excavation.


TPG delivered a complete solution, including FRP slipline pipe and fittings with pressure rated joints, as well as custom-designed adaptor pieces to ensure a secure, reliable pressure rated connection to the existing PCCP system; enabling efficient installation and long-term performance.


Read The Full Case Study Here

 

Field Services - El Paso

Our Field Services team continues to deliver tailored solutions in the field. This FRP biaxial WYE fitting was manufactured at the Grand Prairie plant by our experienced FRP team using precise field measurements, with full coordination with our client on the job site. Grand Prairie also plays a key role in fabricating specialized FRP fittings, supporting complex, custom project requirements.


Contact Pipeline Services: Link Here

Contact by State + Material: Link Here
More About FRP: Link Here

 

Team Highlights

We’re pleased to introduce both our new and long-standing team members. Their experience strengthens our ability to support projects from design through installation.

Jared Humenny

BDM FRP - Mountain States
'Happy to be here and eager to make a positive impact'

Shayne Smith

BDM FRP- Western States
'Winning isn't everything, but wanting to win is'

Drew Hardin

GM FRP - USA and Canada
'
Onward and Upward'


'

David Silva

BDM FRP - Central 
'Don't pray for an easy life; pray for the strength to endure a hard one'

Joe Zelinski

BDM FRP - Mid-Con
'Success isn't given; it's earned every day'

Andrew McCormick

BDM FRP - Eastern States
'Life’s too short to overcomplicate things. Work hard, be decent, and keep showing up'


'

YEAH, WE DO ALL THAT!

 

Award News: In February, our trenchless team won the Abbot Award for innovation. Read more here, and access the full presentation - click here

 
Instagram  LinkedIn

Thompson Pipe Group | 3009 North Laurel Ave | Rialto, CA 92377 US

 
Constant Contact