|
DATE: Friday, March 20, 2026
TRAFFIC IMPACT AND DURATION: From Monday, March 23, through Friday, March 27, between 6 AM and 3 PM, lane closures and lane shifts will be in place at the following locations:
- on the west side of U.S. Route 2/7 (U.S. 2/7) from the Highpoint Center intersection north to the Park & Ride intersection, and,
- on the east side of U.S. 2/7 from the Winooski town line near Checkerbay Carwash north to the Interstate 89 (I-89) Exit 16 southbound on-ramp.
Barriers are in place along the I‑89 Exit 16 northbound off‑ramp and on U.S. 2/7 in front of The Lighthouse Restaurant, and the roadway shoulder in this area is closed.
Independent utility companies will periodically conduct work along U.S. 2/7 between the Winooski town line and Sunderland Woods Road, under lane closures.
Motorists should expect significant delays when traveling through the work zone and along adjacent roadways. Please plan ahead, consider alternative routes, or use other forms of transportation (carpooling, ridesharing, transit, biking, or walking). Drivers should slow down, use caution, and follow flaggers and signage.
|