|
PROJECT UPDATE: Vermont’s first Diverging Diamond Interchange (DDI) at I-89 Exit 16 in Colchester is designed to improve mobility, reduce congestion, and enhance safety for motorists, bicyclists, and pedestrians along the U.S. Routes 2/7 corridor, with traffic scheduled to transition to the new traffic pattern in the coming weeks.
The new traffic pattern briefly shifts vehicles to the left side of the roadway as they travel through the interchange, allowing drivers turning left onto interstate entrance ramps to do so without crossing oncoming traffic. Click here to see step by step how to navigate the new interchange.
This weekend is your last chance to test drive the DDI at the Champlain Valley Fair! Join us, today, Friday, September 4, through Sunday, September 6, in the North Expo of the Robert E Miller Expo Centre.
SPECIAL ANNOUNCEMENT: Please be advised that crews will be off-site starting at noon today, Friday, September 4, in observance of Labor Day. Work is expected to resume as early as Monday, September 7, at 7 p.m.
TRAFFIC IMPACT AND DURATION: Nightly, starting the evening of Monday, September 7, through the morning of Friday, September 11, between 9 p.m. and 6 a.m., unless otherwise noted:
- Lane closures along alternating sides of U.S. Route 2/7 (U.S. 2/7), between South Park Drive and Mountain View Drive, with two-way traffic maintained through traffic shifts onto the open side of the roadway.
- Intermittent width reductions and traffic shifts on South Park Drive, the Interstate 89 (I-89) Ramps, and Mountain View Drive. Traffic will be maintained.
Daily, starting the morning of Tuesday, September 8, through the afternoon on Friday, September 11, between 9 a.m. and 3 p.m. unless otherwise noted:
- Periodic outermost lane closures on either side of U.S. 2/7 between South Park Drive and Mountain View Drive. Two-way traffic will be maintained.
- Single lane closure on alternating sides of U.S. 2/7 between Rathe Road and Hercules Drive. Two-way traffic will be maintained.
Motorists should slow down, use caution, and follow traffic control personnel's instructions and signage. In addition, motorists should expect significant delays when traveling through the work zone and along adjacent roadways. Please plan additional travel time or consider alternative routes.
|