Measure S Progress & Plans

September 2025

01.

Welcome back!




School is underway, and we are thrilled to report a seamless start to the school year thanks to our dedicated staff, students, and families. We also extend our heartfelt gratitude to the community for your continued support of RBUSD, Measure S, facility upgrades, and safety enhancements. This quarterly communication highlights the significant progress made on summer projects and shares what is planned through the end of 2025.


02.

Bond Oversight Committee Ensures Transparency


Our citizens' oversight committee held its first meeting last week and began its vital work of reviewing and reporting on the proper expenditure of taxpayers' money for school construction. As mandated by Education Code Section 15728, the committee actively informs the public about bond revenue expenditures, ensuring every dollar is spent responsibly on improving our schools. Please view the meeting agenda and minutes HERE.


03.

Major Roof Renovations Protect Our Schools



This summer's $9.1 million roofing project is now complete across all school sites. Six schools received complete reroofing with 20-year lifespans: Adams, Beryl Heights (Kinder Wing), Lincoln (MP Building), Parras (Admin Building), Redondo Union HS (300's and 400's Buildings), and Tulita (all classrooms except CDC). Alta Vista, Birney, Jefferson, and Parras received repairs and coating for 10-year extensions.

These improvements protect against leaks, mold, and structural damage while providing better temperature control for optimal learning conditions and long-term energy savings.


Shown here are the Alta Vista roof renovations and other school roof projects in action.


Alta Vista Roof Before

Alta Vista Roof After Upgrade

04.

Enhanced Security Through Comprehensive Fencing Upgrades



Safety remains our top priority, which is why we have invested $4.6 million in comprehensive fencing improvements across twelve school sites. From July through December, we are upgrading fencing at every school, adding protective screens, and increasing fence height around kindergarten areas at Beryl, Lincoln, and Madison.




The project features anti-climb protection and black screening that matches our existing steel fencing, creating a uniform, professional appearance while limiting outside visibility. These enhancements provide crucial intrusion and access control while offering comfort to families who can feel confident their children are protected by thoughtful safety infrastructure. Tulita's fence was completed on August 22, with Beryl Heights, Birney, Madison, and Lincoln scheduled to begin this month and October.



Perimeter fences will receive new protective screens

Before & After: Lincoln fence raised 6' to 7'

Chain links reduced from 2" to 1" mesh to deter climbing

Kinder fences will increase height from 5' to 7'

05.

Student Voice in Elementary Playground Design



Democracy is coming to our playgrounds. Students and staff will have the opportunity to vote on new play structures from carefully pre-selected options, with voting taking place this school year.


This $11 million investment reflects our commitment to creating engaging, safe recreational spaces designed with student input at the heart of the process.





Well-loved playgrounds are in need of renewal

06.

Cutting-Edge Technology Enhances Safety and Learning



Lincoln and Parras schools have been upgraded with state-of-the-art technology and safety systems through Measure S. High-resolution security cameras enhance campus monitoring, while digital clocks with integrated speakers improve daily operations and emergency communication.


New CAT 6 cabling delivers faster, more reliable connectivity, and expanded outdoor Wi-Fi now supports learning in quads and athletic spaces.


Updated bell and horn systems provide clear, consistent signals for class changes and emergencies. Adams Middle School and Washington Elementary are next to receive these comprehensive technology upgrades, and work has already begun.

IT upgrades include new clocks, bells, & PA system

Modernizing our communications

Upgraded & tamed cord clutter in network closets

07.

Brighter, More Efficient LED Lighting Campus-Wide



Every indoor and outdoor space across all school sites now features energy-efficient LED lighting, building on the gym conversions completed in previous years. This district-wide upgrade aligns with California AB 2208 legislation while delivering superior light quality that enhances learning environments. The conversion reduces maintenance requirements and provides significant savings in both energy costs and disposal expenses.


Installation of new lighting

Before and After (above and below): brighter, energy-efficient lighting

08.

Looking Ahead: Major Projects in Development


Our architectural teams are planning major facility upgrades. Lincoln and Madison will be the first elementary schools to receive new portable classrooms. Redondo Union High projects include a Career Tech Ed building, an improved drop-off near the Science building with increased parking, and the Sea Hawk Bowl will see safer stadium seating for athletic events. These projects will take some time, but architectural concepts have begun.

RBUSD is working with architects to turn this RUHS building to a state-of-the-art Career Tech Education building.

The "Flock" can look forward to improved seating

Join the Journey!

Facebook  Instagram