Field Testing: Bridge Joint Monitoring

 

University of New Hampshire (UNH) researchers worked with Vermont AOT loaded trucks and drivers to conduct load testing on three bridges that used Rapid Setting Concrete in Pittsfield, Calais and Craftsbury the week of October 20, 2025. After UNH installed up to 38 sensors per bridge to monitor deflections in multiple directions, traffic was stopped for multiple tests over several hours so that data could be collected at different speeds, quarter span and mid-span, on and off vertical joints so that the team and VT AOT Structures designers can use the data to understand how the Rapid Setting Concrete material performs. This follows a previous project that conducted lab tests to confirm performance. Now the data will be used to develop models of how the material performs in our structures. Learn more about this project. Sign up here to get further updates about this project.

 

Dec 3 Lunch and Learn


Join us at noon ET on Dec 3 to learn from AOT Champions about three projects they are involved in!  


Click here to join on Dec 3

 

Are you using one of our projects? Share Your Implementation Stories

Facebook        X        Instagram        YouTube