Project Overview & Benefits
The City of Miami Beach is replacing aging sewer mains on the Pine Tree Drive bridge between 49 and 51 Streets with two subaqueous sewer lines. These pipes are deemed critical in the City's Sewer Master Plan and are in poor condition, having surpassed their useful life. This project will improve the overall efficiency and reliability of our system.
What's Happening
Construction will extend across the Flamingo Waterway, starting at Sewer Pump Station #15, located at the intersection of Pine Tree Drive and La Gorce Drive, and continuing to the south side of the bridge near 49 Street and Pine Tree Drive. Once completed, road, landscaping, curb, and/or sidewalk repairs will be performed to restore the area to pre-existing conditions.
Maintenance of Traffic (MOT)
This project will be completed in seven phases. Details of lane closures for Phase 1 are provided below:
Phase I
- Northbound (NB) Pine Tree Drive between W 47 and W 51 Streets will be reduced to a single lane.
- Left turn from W 51 Street onto Pine Tree Drive will be prohibited.
- Southbound (SB) La Gorce Drive will be narrowed to a single lane at W 51 Street.
|