G3 Construction Group
News & Updates
March 2022
About Us
Offering professional Third-Party Development Services, Design/Build, Construction Management, and General Contracting, the G3 Construction Group can truly bring your vision to life with the construction option that best meets your project’s needs.
 
Complex renovation projects that require minor or major environmental remediation are expertly performed by the G3/Hygieneering team to professionally control the project related liabilities and costs simultaneously. G3 takes great pride and care to work with clients in meeting and exceeding their professional expectations on each and every project.
Our extensive background in providing comprehensive Third-Party Development and Construction Management Services ensures that each project’s scope, budget and schedule are expertly established through professional communication with the Client, Architects/Engineers and our prequalified sub trades.

The G3/Hygieneering team also provides valued clients with our proven Emergency Response and Incident Command (ERIC™) Disaster Recovery Program that provides a one call system 24/7/365 to provide a very rapid and organized response to stabilize and bring emergency/disaster impacted facilities back to a pre-incident condition.

Contact us to get your upcoming project started today!
Project Spotlight
South Chicago Homeowners Association
Chicago, Il
Structural Repairs

G3 Construction Group was engaged by this Homeowners’ Association on Chicago's South Side to manage a vital structural repair project. After years of observed settlement issues (step cracks in building walls and decks, asphalt surface and concrete settlement, masonry façade damage, balcony steel support damage, door/window opening issues, expansion control joints and foundation issues), a Geotechnical Engineer was hired to perform soil investigations. They found that the soil was not suitable to support these buildings and recommended installing piers to help stabilize and underpin each building’s existing walls or columns.
 
To get these massive repairs underway, while also adhering to the Board’s finite budget, G3 performed this work in two phases. This intrusive project required access to every affected unit in order to install the piers and attach the foundation footing clamp. This was a demanding process, requiring multiple days in each unit, which entailed the following:
 
  • Unit prep including plastic enclosures and negative air machines to filter out any construction related dust
  • Drywall and flooring demo
  • Hydraulic installation of piers
  • Covering of interior holes to prevent tripping and/or fall hazards
  • Replacement of unit flooring and wall repair
  • Site/unit clean-up
 
In addition to the required in-unit work, once the foundations were repaired and stabilized, G3 engaged a masonry contractor to perform the necessary façade repairs resulting from years of erosion and settlement damage. 
Emergency Response and Incident Command (ERIC) Program
Recently, G3 was engaged by a Bolingbrook Eye Center to provide Emergency Response and Incident Command (ERIC) Services after a car crashed through the storefront. The G3 team was onsite that same day and was able to quickly assess the damage and manage the restoration to get this busy eye center back to pre-incident condition.

The scope of work included:
  • disconnect electricity in areas where the car crashed through the building
  • debris clean up
  • plastic containment and negative air machine set up to control dust/debris
  • temporary entrance door installation
  • framing repairs & drywall installation
  • sanding/priming/painting
  • cabinet/countertop reinstallation
  • ceiling tile replacement
  • flooring repairs/installation
  • window replacement
  • reconnect electricity

With G3's quick response and timely restoration, this eye center is now fully operational and looks better than ever!

Contact us today to enroll your property in this beneficial program! To learn more visit the ERIC webpage.
OSHA News
US Department of Labor Reminder

Required 2021 Injury, Illness data must be submitted by March 2, 2022.

The U.S. Department of Labor’s Occupational Safety and Health Administration reminds employers that the agency began collecting calendar year 2021 Form 300A data on Jan. 2, 2022. Employers must submit the form electronically by March 2, 2022.

Visit here for more information.
Other News
2022 Polar Plunge
G3's Sean O'Brien is once again braving the chilly Lake Michigan waters to raise money for Special Olympics. This year, his team is hoping to raise $30,000! These funds benefit Special Olympics Chicago athletes by covering program costs such as transportation, sports equipment, team uniforms, and meals. Please see the link below to learn more about this great cause or to make a donation. Stay warm out there!