Gainesville begins first roadway projects funded by infrastructure surtax

GAINESVILLE, Fla. (Dec. 21, 2023) – A one-mile stretch of North Main Street is the first Gainesville road project funded by the portion of the Wild Spaces Public Places surtax dedicated to improving local infrastructure. The City has branded these capital projects as “Streets, Stations & Strong Foundations” (SSSF).


The resurfacing and restriping of North Main Street between 39th and 53rd avenues began earlier this month and will include bike lanes in both directions. This SSSF project is expected to cost $1.2 million in funding from the surtax.


“The construction work should finish by spring of next year. However, the contractor is currently ahead of schedule and expects to complete the work in early February,” said City of Gainesville Public Works Director Brian Singleton.


A second SSSF project on the schedule is along NE 9th Street. Now in the early planning stages, it’s expected to improve roadway safety and fix the pavement along a 1.5-mile strip from East University Avenue to NE 23rd Avenue. The first step involves gathering feedback from neighbors, and a workshop is planned early in the New Year. City staff also is developing a survey that will be available online or as a printed handout at the workshop.


Changes to NE 9th Street could include: wider sidewalks; additional crosswalks; eliminating parking on the street; creating curbside pull-out stops for buses; bus-stop shelters; and widening bike lanes or creating bike lanes physically separated from traffic.


“It is exciting to see physical progress with SSSF. The City of Gainesville doesn’t have control over many roads inside our city but it is good to see staff and our contractors ahead of the game on the roads we do control,” said Gainesville City Commissioner Reina Saco. “Making our streets, our sidewalks and our bike lanes safer for everyone is one of the best investments we can make with these funds,” she said.


Input gathered through community engagement will become part of a report to be presented to the Gainesville City Commission later next year. Depending on which changes the commission approves, estimated costs for the NE 9th Street SSSF project could fall between $3.2-6.2 million.


In November 2022, Alachua County residents voted in favor of a one-cent sales tax levied for the next 10 years, expected to generate $17.4 million per year to the City of Gainesville. Fifty percent of surtax proceeds are dedicated to Wild Spaces Public Places projects. The remaining half is dedicated to road repair, public-safety buildings and land for affordable housing.


For more information, contact City of Gainesville Public Information Officer Rossana Passaniti at 352-318-9599 or [email protected].

 

###

About the City of Gainesville: Gainesville is defining a new kind of city - a new American city - that aspires to become a model for other communities by solving critical issues through collaboration and intentional design. The purpose of our city is the people of our city.
Facebook  Twitter  Instagram