Grindley Aquatic & Wellness Campus Takes Shape as Pool is Installed
 
Since our last Grindley Aquatic & Wellness Campus update, we've made a lot of progress and are continuing to post progress pictures on our Facebook page.

Pool & Entry Buildings
Contractors are working on the interior of the pool and entry buildings. This work includes installing electrical wires and pipes for plumbing. Next week, insulation and dry wall will be added to the interior walls.

You may have noticed the unique color of the pool building in pictures. This pink color is a waterproof sealant and is not the final color of the building. Siding will be added to the exterior of both buildings. The metal roof on the pool building is finished, and a metal roof will be installed on the entry building soon.



Pool
Patterson Pools from Columbus, Ohio is onsite working on our 6,000 square foot swimming pool. The structure of the walls has been installed, and the stainless steel lining is finished.

The crew is now clearing out the gravel to lay the rebar and metal mesh for the pool floor. The next major step is pouring the concrete for the floor, which is scheduled to take place in the coming weeks. Special thanks to Patterson Pools for their hard work on this project thus far.


Wellness Center
The foundation of our 4,000 square foot Wellness Center is finished. The concrete floor has been poured and is now curing. After the floor is ready, framing will start, and the Wellness Center will begin to take shape. 