Q: Where is the new campus building going to be situated?
A: In response to feedback from the community, the planned new building was moved nearer the northern border of the campus, adjacent to the Vons Shopping Center. This move was made to place the RCFE building further from neighboring homes. The project underwent major revisions in 2019 and 2020 in response to feedback from the community.
Q: How will the campus be powered?
A: The certified EIR addressed the impacts of campus infrastructure. The campus will utilize newer, greener power generation, and will be built to LEED (Leadership in Energy and Environmental Design) building standards. It should be noted that fuel tanks for generators have been located on the campus for more than 60 years without incident.
Q: What is the total area of the Healthy Living Campus?
A: The total developed building area for the project – which consists of two phases – is estimated at 665,820 square feet by architect Paul Murdoch.
BCHD is currently focused on Phase 1 of the Healthy Living Campus project, which is estimated to be 283,070 square feet. This building is the curved L-shaped building (orange) at the upper left of the diagram below. Phase 2, which includes the round building in the center of the diagram and the structures to the right in the diagram (light blue), is currently estimated at 382,750 sq. ft.
Murdoch estimates that when complete, the total project will be 792,520 square feet – a figure that includes the square footage of the existing 520 (47,000 sq. ft.) N. Prospect Ave. medical building (dark blue at bottom left in the diagram).
|