Henley Construction provided Preconstruction and Construction Management services through the adaptation and use of a Butler Manufacturing pre-engineered metal building to meet the specific needs of this 25,000 square foot boat building facility. The building stands 50’ high and includes three boat manufacturing bays totaling 18,200 square feet, a 7,500 square foot two-story mezzanine, 3,500 square feet of office, conference and support space, as well as 4,000 square feet of additional storage and shop space. The mezzanine levels are serviced by a three-stop elevator, a three-stop material lift platform as well as a stairway. 22,000 pound bi-fold doors allow easy access for moving boats from building bays to the marina.