|
Highway (Hwy) 105 traffic shift to south side lanes expands East
Over the weekend of Saturday, Sept. 9 & Sunday, Sept. 10 construction traffic control will be undergoing modifications and preparing for the Knollwood closure.
Construction Traffic Control Modification
The traffic shift to the south side lanes between Jackson Creek Parkway and Knollwood will expand east to approximately Lake Woodmoor Drive. This traffic shift will remain in place for approximately one year to allow crews to work on the north side lanes of Hwy 105.
Effective Monday, Sept. 11 Knollwood, between Hwy 105 and South Park Drive, will be fully closed through approximately January 2024 to enable crews to efficiently construct a roundabout at the Knollwood / Village Ridge Point intersection. In addition to traffic control devices, a temporary mobile traffic signal will be placed at the Hwy 105 / LDS Church intersection, and the project team will be optimizing signal timing at the Knollwood / Hwy 105 intersection.
The estimated schedule is based on the best information available at this time and is weather/resource-dependent.
Traffic wanting to access Monument Academy, Integrity Bank, and Premier Vision will be directed to use the new paved temporary access to Village Ridge Point off of Hwy 105, just east of Integrity Bank.
To ACCESS Village Ridge Point: use the paved temporary access onto Village Ridge Point
-
If heading eastbound on Hwy 105: at the Knollwood and Hwy 105 traffic signal, use the left turn lane, veer left on Hwy 105 to the north side of the westbound through lane. Turn left onto the new temporary paved access on Highway 105 to Village Ridge Point. To access Monument Academy, turn right on Village Ridge Point and remain in the left/northerly lane.
-
If heading westbound on Hwy 105: enter the westbound right turn lane on Hwy 105 just west of the LDS Church driveway/Morning Canyon Road, and turn right onto the new temporary paved access onto Village Ridge Point. To access Monument Academy, turn right on Village Ridge Point and remain in the right/southerly lane.
To EXIT Village Ridge Point:
-
During school drop-off/pick-up times (see school schedule below): all traffic will head east and go through the Monument Academy property to exit through the west LDS Church Driveway and turn right or left onto Hwy 105. Use the temporary traffic signal.
-
During non-school drop-off/pick-up times: use the newly paved temporary access, and turn right only onto Highway 105 (you will not be able to turn left onto Hwy 105).
- Only Integrity Bank and Premier Vision traffic will be allowed to exit on the temporary paved access.
To ACCESS Village Center Subdivision:
-
From Hwy 105 to Morning Canyon Road: All traffic must enter from eastbound Hwy 105 and turn right-in only. Westbound Hwy 105 to southbound left turns will NOT be allowed.
-
From Knollwood: Unchanged from existing access traffic pattern.
To EXIT Village Center Subdivision:
-
From Morning Canyon Road to Hwy 105: All northbound traffic must turn right out only onto eastbound Hwy 105. Northbound left turns to westbound Hwy 105 will NOT be allowed. Northbound access to the LDS Church will NOT be allowed.
-
To Knollwood: Unchanged from existing access traffic pattern. All traffic wanting to go westbound on Hwy 105 must use Knollwood. All traffic that wishes to access Village Ridge Point and the LDS Church must use Knollwood.
To ACCESS the LDS Church:
-
Monday through Saturday: All traffic must enter from westbound Hwy 105 and turn right-in only. Eastbound left turns from Hwy 105 will NOT be allowed.
-
Sundays only: Westbound Hwy 105 traffic will turn right-in, and eastbound Hwy 105 traffic will be allowed to turn left-in. Use the temporary traffic signal.
- To access the LDS Church from Knollwood Dr. south of Hwy 105: use the signed detour to Lake Woodmoor Drive, re-access Hwy 105 further to the east, and make a right turn to the LDS Church.
To EXIT the LDS Church:
-
Traffic may turn left-out or right-out. Use the temporary traffic signal.
|