View as Webpage

Highway 105A Construction UPDATE

October 8, 2024

Intermittent Closures at Southbound Knollwood Boulevard


On Thursday, October 10, and Friday, October 11, intermittent closures should be expected south on Knollwood at Highway 105, lasting from 30 minutes to an hour at various times during the day for paving operations.


During this time, Monument Academy will be on break for parent-teacher conferences.


Alternate routes are highly encouraged.


On Saturday, October 12, Knollwood will be closed between Highway 105 and Cipriani Loop during the entire day due to paving operations. Knollwood is expected to be open by Saturday night, October 12. A detour will be in place ad businesses will be open. Access to businesses will be from Knollwood Dr. to Cipriani Loop. Access to the Village Center Subdivision will be from Knollwood Dr. to Cipriani Loop or Highway 105 to to Morning Canyon Rd.



Pictured is a detour map of alternate routes during the Knollwood closures.

We are continually monitoring traffic control and making changes as needed to minimize impacts as much as possible.


Flagger operations should be expected throughout the remainder of the project.


Construction of Highway 105 improvements will continue into spring 2025.


The estimated schedule is based on the best information available at this time and is weather and resource-dependent.

Monument Academy Traffic


To ensure a smoother experience for non-school traffic, we recommend finding an

alternate route, if possible, that avoids this area during these school drop off/pick up times:

Mondays – Thursdays: 7 – 8:30 a.m. and 2:45 – 4 p.m.

Fridays: 7 – 8:30 a.m. and 11:30 a.m. – 1 p.m.

MULTIPLE ROADWAY AND UTILITY PROJECTS


There are multiple roadway and utility projects both underway and planned for this area of the community being led by different jurisdictions. The project teams are coordinating efforts to minimize impacts to the traveling public as much as possible. ALTERNATE ROUTES, IF POSSIBLE, ARE HIGHLY ADVISED.

Highway 105A Construction – El Paso County (Construction duration: July 24, 2023 – expected to continue into spring 2025)

The project extends the 4-lane section of Highway 105 just east of Jackson Creek Parkway to Lake Woodmoor Drive, providing greater mobility by accommodating more traffic. The new configuration will be two lanes in each direction with left and right turn lanes. The project also includes multi-use shoulders and pedestrian improvements, sidewalk connectivity, replacement of the traffic signal at Knollwood Boulevard, a new underground drainage system and water quality pond, and a new roundabout at the Knollwood/Village Ridge Point intersection. The new roundabout, coupled with new queuing lanes constructed by Monument Academy, are designed to keep traffic moving and reduce the traffic backups on Highway 105 that have previously occurred in this area.

CLICK TO VIEW MAP  

Hwy105A Construction and Monument Junction Interim JCP Improvements

Stay Informed

Recorded Message Phone: 719-423-8100

Sign up for project updates by sending an email to: 

Hwy105Aconstruction@gmail.com

JacksonCreekPkwy@gmail.com

 

Prior versions of the newsletters and project maps are available on the project websites:  

Hwy 105a: http://EPC-Hwy105AConstruction.com/

Jackson Creek Parkway: https://www.jacksoncreekpkwy.com/