The recently completed Feasibility Study provided Congregation feedback on the current Hope South Campus Building Program. The Activity Center, as presented during the study, was seen as too small and not innovative enough. The Hope Strategic Planning Committee took this feedback and expanded the Activity Center to accommodate 50 people in meetings, a dedicated counseling area, a dedicated refreshment area, a dedicated area for a receptionist, an additional restroom and additional storage. This increased the size to 2,036 sf and the construction cost to $500,000. These modifications resulted in redesigning the foyer and front entry and moving the porch to the rear of the building and increased the size to 811 sf.
|