Your go-to source for Association and transportation industry news, notes, and need-to-knows | | WTBA sincerely thanks its 2026 Weekly Update sponsors: Brooks Tractor, County Materials Corporation, Fabick Cat, and Roland Machinery Company. Please click on the logos to reach their respective websites. | | |
IN THIS WEEK'S EDITION
NEWS & NOTES
- State Patrol aerial speed enforcement gives I-94 crews added sense of safety
- Police go undercover in New York to catch speeders in work zones
INDUSTRY INSIGHTS
- Updated DNR procedures mean changes for designers, contractors seeking NOI & ECIP approvals
MEMBER SPOTLIGHT
- NEW VIDEO shows just how busy, important freeway bridge project is to western Wisconsin
WHAT WE'RE WATCHING
- Engineers planning public info session for Phase 2 of John Nolen reconstruction
- WisDOT, contractors recycle bridge girders for temporary structures on East-West project
EVENTS & REMINDERS
- New 2026-27 Directory & Buyer's Guide arriving in member mailboxes soon
- State opens latest round of EV charger construction grants
| | 'It's a huge deal': Northwest Region supports contractors with aerial speed enforcement | | |
A squad car appearing in the rearview mirror makes most drivers anxious.
A State Patrol squad sitting near a new traffic pattern on I-94 this spring? That was a welcome sight for Jason Ivers.
“One hundred percent… It was a huge difference,” Ivers said.
The Hoffman Construction Company project manager says drivers completely changed their behavior when State Patrol was able to be there, going about 45 MPH through the updated configuration near Highway 53 instead of the usual 70-plus.
| |
“You have a semi go by you going 65 miles per hour, and all that’s between you and that semi is a barrel, you realize life can be fragile.
"Something bad can happen in an instant,” Ivers said.
With that in mind, State Patrol Troopers specifically focused on Hoffman’s 8 ½-mile reconstruction of the interstate near Eau Claire on Thursday with an added card up their sleeve: a State Patrol airplane tracking cars through the 60 MPH work zone.
| | |
WisDOT’s Northwest Region invited WTBA and local media for speed enforcement ride-alongs for its turn at season-long, statewide safety events.
“We count on construction crews to build and maintain an efficient and reliable transportation system and they need to be able to count on us to protect them while they work,” NW Region Capt. Craig Larson said.
| | | |
A sworn deputy in the sky has his hands full, piloting the plane while timing drivers between painted lines on the freeway, then crunching the numbers to generate an accurate speed. He then radios troopers on the ground--who are waiting just beyond the construction zone--with descriptions of the car, its speed, and position.
Northwest Region Troopers pulled over more than 165 drivers doing at least 18 MPH over the speed limit in the I-94 work zone during five aerial traffic details in 2025. At least two drivers were going more than 100 MPH.
| | | | |
“What I hear a lot (from drivers) is just they’re not paying attention,” Trooper Cory Schalinske told WTBA after issuing a ticket Thursday morning to a driver going 82 in the 60 MPH zone.
“It feels good that we’re working hand in hand (with construction crews), that they recognize us. We recognize them and we want to make it safer for them.”
| | |
State Patrol aerial speed enforcement has been around since the 1950s and WisDOT does its best to let drivers know ahead of time that a mission is focused on a particular work zone. The goal, they say, is to educate more than punish.
Still, there are only so many planes and limited funds, which means police can’t protect every work zone every day. Jason Ivers wants police to know they’re welcome around his crews any time it’s possible.
“Having that enforcement out there, even just having lights on, is a huge deal,” Ivers said. “Those little things, the teamwork and the group effort to make that safe was appreciated.”
| | Police disguised as construction workers catch dozens of speeders in New York work zone | | |
Undercover police in upstate New York traded their light-gray state patrol uniforms for reflective vests and hard hats to catch reckless drivers in work zones.
The operation made a mark.
| |
Photo courtesy New York State Police
Police issued 94 citations inside a single work zone in just eight hours, with a vast majority going to speeders.
Officers dressed as construction workers and carried radar guns, then relayed information about drivers going well over the reduced limit to uniformed police farther down the road.
New York launched “Operation Hard Hat” in conjunction with National Work Zone Awareness Week in April.
New York state police hope the crackdown makes drivers especially cautious in work zones, causing them to wonder if someone is always watching in areas where risky behavior can have deadly consequences.
| | Updated DNR procedures lead to new requirements for designers, contractors | | |
New Department of Natural Resources procedures will require designers and contractors to change how they apply for stormwater permit approval on future projects.
These changes go into effect beginning with the August Project Specifications/Estimate window and WisDOT’s November 10, 2026 letting.
WTBA first shared this info with members via Construction Notes earlier this week.
| | | |
Design Process:
Instead of submitting a Notice of Intent (NOI) for TCGP coverage and the Erosion Control Plan during the design phase, submittals will now happen during the preconstruction phase, after the state awards a project to the prime contractor.
Construction Process:
Contractors will complete their Erosion Control Implementation Plan (ECIP) and submit it to their WisDOT project manager for review. WisDOT then has two days to look over the ECIP and send it and the NOI to DNR at the same time.
DNR has 14 working days to review the forms, then WisDOT has another two working days to compile comments for the contractor. There is no set timeframe for DNR to review and comment on subsequent submittals, but DNR has agreed to make "reasonable efforts" to return comments ASAP.
Contractors may not begin disturbing any land on a project until both the ECIP is approved and DNR agrees to coverage under the TCGP.
WisDOT Analysis & Explanation
You can read WisDOT’s full explanation of the changes HERE (NOTE: The changes are final, despite the document saying “draft”).
VIRTUAL INFO SESSION
WisDOT will hold a virtual information session to walk people through the changes on Thursday, June 25 from 1-2:30 p.m.
Click HERE for links and login information. The meeting will be held via Microsoft Teams.
| | WATCH: WTBA members help lawmaker grasp importance of transportation funding through busy bridge tour | | |
Lawmakers who sign up for WTBA-led meetings don’t just hear talking points, they encounter an immersive experience that tends to stick with them.
Just ask State Rep. Shannon Zimmerman, who toured the I-94 bridge rehab work over the St. Croix River early last week.
Zimmerman (R-River Falls) walked where Lunda Construction Crews are replacing joints, doing an epoxy overlay, and some painting along a pair of bridges that carry upwards of 90,000 vehicles a day between Wisconsin and Minnesota.
Traffic at freeway speeds regularly whooshes past on both sides of the construction zone.
(Click the thumbnail above to watch our recap video!)
“It’s one thing to be in a vehicle when you’re going through that zone, it’s a very different thing to be outside that vehicle,” Zimmerman told WTBA after the tour. “Those of us who serve (in the state Legislature) all have different backgrounds, so when we have this opportunity I think it’s incredibly valuable.”
The tour marked the second in a series of visits staff–led by Elise Nelson–will make with the WTBA of Tomorrow councilmembers this summer.
The goal is to get lawmakers behind the barrels, meeting members of WTBA companies who are doing important work with state taxpayer dollars, showing members of the Legislature the importance of our industry and investments they make in the state budget.
| | Engineers to present next phase of John Nolen Drive reconstruction June 2 | | |
It will still take another year for work to be done on the first phase of the John Nolen Drive reconstruction in Madison, but city engineers are ready to provide an update on the next big step.
The city will hold a virtual public information meeting on Tuesday, June 2 at 6 p.m. via Zoom to talk about design plans for the stretch of busy roadway between Olin Avenue and East Lakeside Street.
| | | |
Crews led by prime contractor Zenith Tech, Inc. (Walbec Group) and sub Edgerton Contractors began replacing the southbound John Nolen causeway bridges in fall 2025. WTBA received a brief tour of the progress in April.
Work on that side of the road is scheduled for mid-summer completion, at which point Zenith Tech will switch to working on the northbound lanes.
The City of Madison received $15 million from the federal government to go with its own $30 million set aside for the work.
Nearly 50,000 vehicles cross the John Nolen bridges every day to get into and out of downtown Madison, making this project especially important to be done well and done as quickly as possible.
| | Recycled girders get new (temporary) life on I-94 East-West project | |
I-94 East-West is the new John Nolen Drive, as it were... even if just temporarily.
Crews placed old concrete girders from the main highway into and out of downtown Madison on a temporary roadway along the freeway in Milwaukee this week, where crews are expanding and modernizing about 3 ½ miles of interstate near American Family Field.
The recycled beams will support a temporary bridge to help traffic flow in both directions while crews build new eastbound I-94 lanes and bridges.
WisDOT’s I-94 East-West Facebook page this week showed a timelapse of crews placing the recycled girders over 64th Street.
Zenith Tech, Inc. (Walbec Group) is working on both major projects, which include replacing six bridges along the John Nolen Causeway in Madison and expanding I-94 from six to eight lanes in metro Milwaukee.
The temporary girders moved from Madison to Milwaukee will stay in place through summer 2028, while the John Nolen Drive project will shift from the southbound bridges to the northbound side later this year.
| | Annual directories arriving in member mailboxes soon | | |
Every industry contact a WTBA member might need to call or reference will soon be at their fingertips.
WTBA mailed out the 2026-27 version of the Directory & Buyer’s Guide last week.
Each member company receives two free hard copies. Meanwhile, a digital version is available 24/7 with a valid WTBA.org member login via THIS link.
Members can order additional copies for $10 apiece by filling out the form on page 127 of the directory or emailing a request to Michelle Klubertanz.
Non-members can order copies for $50 each.
| | | WisDOT opens new round of EV charger funding | | |
More electric vehicle chargers should begin to appear along key Wisconsin roadways in the coming years thanks to another round of federal funds, bolstering the state’s Transportation Fund.
WisDOT announced this week it opened a new round of applications for Level 3 EV charges through the National Electric Vehicle Infrastructure program. Chargers must be placed at private businesses such as gas stations, convenience stores, hotels, and retail centers within one mile of an interstate exit or a state highway intersection.
To-date, Wisconsin has doled out about $37 million of federal grants for the charger build-out, which began under the Bipartisan Infrastructure Law in 2021. The funding has helped pay for 21 fully operational chargers with more in construction.
The state has another $40 million to offer, with the federal money covering up to 80% of the costs.
Three cents per kilowatthour sold at the charging stations will go into the state Transportation Fund, thanks to a WTBA-supported law. The Department of Revenue estimated that would generate about $3 million in FY2025, but should increase as more people buy EVs.
The latest round of WEVI applications is open through July 24, 2026.
| | CONNECT WITH US ON SOCIAL | | | | |