|
Construction activities continue along the I-15 corridor, including sound wall and retaining wall construction, concrete and asphalt paving operations, bridge reconstruction, and other improvements to support a wider freeway footprint. Temporary barriers (k-rail) remain in place along freeway and ramp shoulders to create safe work zones.
What to Expect:
- Daytime and nighttime work may impact traffic flow and travel time.
- Expect intermittent ramp and freeway lane closures. Please allow extra time to reach your destination.
- Drive with caution; watch for signage, construction vehicles, and crew members throughout the corridor.
- Reduced speed limits are strictly enforced in construction zones to protect both drivers and workers.
- Work may be loud and cause vibrations at times.
Construction will generally occur Monday through Friday during daytime (6:00 a.m. to 4:00 p.m.)
and nighttime (9:00 p.m. to 5:00 a.m.) hours. All construction is dynamic and subject to change. Please check the Google Map for the most updated closure and detour information.
Si prefiere recibir información de construcción en español, llame al (877) 55-SBCTA.
|